The invention discloses a high-safety installation method of a steel pipe tower of a 5G power transmission tower. The high-safety installation method of the steel pipe tower of the 5G power transmission tower comprises the following steps of preparing an installation tool; providing an elevator, a pulley device and a crane and installing the elevator, the pulley device and the crane in place afterthe steel pipe tower of the 5G power transmission tower is closed; placing a guy cable on a guy expanding trolley by using the crane and expanding the guy cable; installing a traction piece at the high-position end of the guy cable, and connecting the traction piece with a steel wire rope; installing another traction piece at the low-position end of the guy cable, and connecting the traction piece with the steel wire rope; and arranging supporting points on two sides of a tower frame of the steel pipe tower. According to the high-safety installation method of the steel pipe tower of the 5G power transmission tower, steel pipe towers, with different sizes, of the 5G power transmission tower can be installed to the greatest extent through the cooperation of the elevator, the pulley device and the crane, meanwhile, the steel pipe tower does not need to be lifted by an operator, consequently, the work injury condition is avoided, and the installation efficiency is high.
本发明公开了一种5G输电塔的钢管塔的高安全性安装方法,该5G输电塔的钢管塔的高安全性安装方法包括以下几个步骤:安装工具准备,5G输电塔的钢管塔合龙后,提供提升机、滑轮装置和吊车并安装到位,利用吊车将拉索放置在展索小车上延展开来,在拉索的高位端安装一个牵引件,牵引件与钢丝绳连接,在拉索的低位端安装装另一个牵引件,该牵引件与钢丝绳连接;钢管塔的塔架上两边均设置支撑点;本发明所述的一种5G输电塔的钢管塔的高安全性安装方法,该方法通过利用提升机、滑轮装置和吊车的相互配合使用,能够最大程度的对不同尺寸的5G输电塔的钢管塔进行安装,同时无需操作人员抬起,避免发生工伤情况,安装效率高,且安装效率高。
The invention discloses a high-safety installation method of a steel pipe tower of a 5G power transmission tower. The high-safety installation method of the steel pipe tower of the 5G power transmission tower comprises the following steps of preparing an installation tool; providing an elevator, a pulley device and a crane and installing the elevator, the pulley device and the crane in place afterthe steel pipe tower of the 5G power transmission tower is closed; placing a guy cable on a guy expanding trolley by using the crane and expanding the guy cable; installing a traction piece at the high-position end of the guy cable, and connecting the traction piece with a steel wire rope; installing another traction piece at the low-position end of the guy cable, and connecting the traction piece with the steel wire rope; and arranging supporting points on two sides of a tower frame of the steel pipe tower. According to the high-safety installation method of the steel pipe tower of the 5G power transmission tower, steel pipe towers, with different sizes, of the 5G power transmission tower can be installed to the greatest extent through the cooperation of the elevator, the pulley device and the crane, meanwhile, the steel pipe tower does not need to be lifted by an operator, consequently, the work injury condition is avoided, and the installation efficiency is high.
本发明公开了一种5G输电塔的钢管塔的高安全性安装方法,该5G输电塔的钢管塔的高安全性安装方法包括以下几个步骤:安装工具准备,5G输电塔的钢管塔合龙后,提供提升机、滑轮装置和吊车并安装到位,利用吊车将拉索放置在展索小车上延展开来,在拉索的高位端安装一个牵引件,牵引件与钢丝绳连接,在拉索的低位端安装装另一个牵引件,该牵引件与钢丝绳连接;钢管塔的塔架上两边均设置支撑点;本发明所述的一种5G输电塔的钢管塔的高安全性安装方法,该方法通过利用提升机、滑轮装置和吊车的相互配合使用,能够最大程度的对不同尺寸的5G输电塔的钢管塔进行安装,同时无需操作人员抬起,避免发生工伤情况,安装效率高,且安装效率高。
High-safety installation method of steel pipe tower of 5G power transmission tower
一种5G输电塔的钢管塔的高安全性安装方法
2020-11-13
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Power transmission tower angle steel reinforcing device and power transmission tower
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2024
|