Steel structure bridge tower installation positioning tool and steel structure bridge tower installation construction method
The invention discloses a steel structure bridge tower installation positioning tool and a steel structure bridge tower installation construction method, and belongs to the technical field of steel structure bridges. The mounting and positioning tool comprises a first positioning piece which is mounted on the first section, and the first positioning piece is provided with an abutting part and a first limiting hole; the second positioning piece is mounted on the second section, and a first limiting surface, a second limiting surface and a first positioning hole are arranged on the second positioning piece, so that the first limiting surface and the second limiting surface are respectively matched with the inner wall surface and the abutting part of the first section to guide the section position of the first section in the approaching and splicing process of the first section and the second section; furthermore, through alignment locking of the first positioning hole and the first limiting hole, the splicing alignment posture of the first section and the second section is adjusted, and the limiting directions of the first limiting surface and the second limiting surface intersect. According to the installation positioning tool and the installation construction method, the operation difficulty of sectional assembly of the steel structure bridge tower can be reduced, and the operation efficiency is improved.
本申请公开了一种钢结构桥塔安装定位工装和钢结构桥塔安装施工方法,属于钢结构桥梁技术领域;安装定位工装包括:第一定位件,安装到第一分段上,且第一定位件上设置有抵接部和第一限位孔;第二定位件,安装到第二分段上,第二定位件上设置有第一限位面、第二限位面以及第一定位孔,以在第一分段和第二分段接近拼装过程中,第一限位面和第二限位面分别配合第一分段的内壁面和抵接部引导第一分段落位,并进一步通过第一定位孔和第一限位孔对位锁定,调节第一分段和第二分段的拼接对位姿态,且第一限位面和第二限位面的限位方向相交。本申请提供的安装定位工装和安装施工方法能够降低钢结构桥塔分段拼装操作难度,改善操作高效。
Steel structure bridge tower installation positioning tool and steel structure bridge tower installation construction method
The invention discloses a steel structure bridge tower installation positioning tool and a steel structure bridge tower installation construction method, and belongs to the technical field of steel structure bridges. The mounting and positioning tool comprises a first positioning piece which is mounted on the first section, and the first positioning piece is provided with an abutting part and a first limiting hole; the second positioning piece is mounted on the second section, and a first limiting surface, a second limiting surface and a first positioning hole are arranged on the second positioning piece, so that the first limiting surface and the second limiting surface are respectively matched with the inner wall surface and the abutting part of the first section to guide the section position of the first section in the approaching and splicing process of the first section and the second section; furthermore, through alignment locking of the first positioning hole and the first limiting hole, the splicing alignment posture of the first section and the second section is adjusted, and the limiting directions of the first limiting surface and the second limiting surface intersect. According to the installation positioning tool and the installation construction method, the operation difficulty of sectional assembly of the steel structure bridge tower can be reduced, and the operation efficiency is improved.
本申请公开了一种钢结构桥塔安装定位工装和钢结构桥塔安装施工方法,属于钢结构桥梁技术领域;安装定位工装包括:第一定位件,安装到第一分段上,且第一定位件上设置有抵接部和第一限位孔;第二定位件,安装到第二分段上,第二定位件上设置有第一限位面、第二限位面以及第一定位孔,以在第一分段和第二分段接近拼装过程中,第一限位面和第二限位面分别配合第一分段的内壁面和抵接部引导第一分段落位,并进一步通过第一定位孔和第一限位孔对位锁定,调节第一分段和第二分段的拼接对位姿态,且第一限位面和第二限位面的限位方向相交。本申请提供的安装定位工装和安装施工方法能够降低钢结构桥塔分段拼装操作难度,改善操作高效。
Steel structure bridge tower installation positioning tool and steel structure bridge tower installation construction method
一种钢结构桥塔安装定位工装和钢结构桥塔安装施工方法
LI WEILONG (author) / CHEN GUANYU (author) / YUAN KAI (author) / ZHAO XIN (author) / HE ZHIGUO (author) / PENG YINGCHUAN (author) / YANG LE (author) / SHI WENWEI (author) / LIN HONG (author) / LUO JUN (author)
2024-05-31
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Positioning installation anchoring structure for bridge leaning tower and construction method
European Patent Office | 2023
|Segmented installation method of cable-stayed bridge steel tower
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2023
|Bridge steel structure installation construction closure method
European Patent Office | 2024
|