Bottom tool of upper assembly of offshore wind power booster station and mounting method
The invention discloses a bottom tool of an upper assembly of an offshore wind power booster station and a mounting method. The bottom tool comprises a buttress and four tool units, and each tool unitcomprises two parallel girders arranged on the buttress, two first main beams fixed on the two parallel girders, two second main beams fixed between the two first main beams, two side beams fixed onthe two parallel girders and horizontal inclined supports arranged between the side beams and the first main beams and between the first main beams and the second main beams; the middle parts of the first main beams and the second main beams are mounting seats of the upper assembly of the offshore wind power booster station. In the present invention, each tool unit is provided with one mounting seat of the upper assembly of the offshore wind power booster station. The four tool units are provided with four mounting seats, four pile leg connecting joints are arranged on the upper assembly of the offshore wind power booster station, the four pile leg connecting joints and the four mounting seats are used for mounting and transporting after being fixed, the mounting precision is improved, andthe integrity and stability of stress are ensured.
本发明公开了一种海上风电升压站上部组件的底部工装和安装方法,包括:支墩以及四个工装单元,工装单元包括:设置在支墩上两根平行的大梁;固定在两根平行的大梁上的两根第一主梁;固定在两根第一主梁之间的两根第二主梁,第一主梁和第二主梁的中部为海上风电升压站上部组件的安装座;固定在两根平行的大梁上的两根边梁;以及设置在边梁和第一主梁之间以及第一主梁与第二主梁之间的水平斜支撑。本发明中,每个工装单元都带有一个海上风电升压站上部组件的安装座,四个工装单元带有四个安装座,海上风电升压站上部组件有四个桩腿连接节点,将四个桩腿连接节点与四个安装座固定后,用于安装和运输,提高安装精度,确保受力的整体性和稳定性。
Bottom tool of upper assembly of offshore wind power booster station and mounting method
The invention discloses a bottom tool of an upper assembly of an offshore wind power booster station and a mounting method. The bottom tool comprises a buttress and four tool units, and each tool unitcomprises two parallel girders arranged on the buttress, two first main beams fixed on the two parallel girders, two second main beams fixed between the two first main beams, two side beams fixed onthe two parallel girders and horizontal inclined supports arranged between the side beams and the first main beams and between the first main beams and the second main beams; the middle parts of the first main beams and the second main beams are mounting seats of the upper assembly of the offshore wind power booster station. In the present invention, each tool unit is provided with one mounting seat of the upper assembly of the offshore wind power booster station. The four tool units are provided with four mounting seats, four pile leg connecting joints are arranged on the upper assembly of the offshore wind power booster station, the four pile leg connecting joints and the four mounting seats are used for mounting and transporting after being fixed, the mounting precision is improved, andthe integrity and stability of stress are ensured.
本发明公开了一种海上风电升压站上部组件的底部工装和安装方法,包括:支墩以及四个工装单元,工装单元包括:设置在支墩上两根平行的大梁;固定在两根平行的大梁上的两根第一主梁;固定在两根第一主梁之间的两根第二主梁,第一主梁和第二主梁的中部为海上风电升压站上部组件的安装座;固定在两根平行的大梁上的两根边梁;以及设置在边梁和第一主梁之间以及第一主梁与第二主梁之间的水平斜支撑。本发明中,每个工装单元都带有一个海上风电升压站上部组件的安装座,四个工装单元带有四个安装座,海上风电升压站上部组件有四个桩腿连接节点,将四个桩腿连接节点与四个安装座固定后,用于安装和运输,提高安装精度,确保受力的整体性和稳定性。
Bottom tool of upper assembly of offshore wind power booster station and mounting method
一种海上风电升压站上部组件的底部工装和安装方法
GONG SHUNFENG (author) / JIANG XIAOMING (author) / CHENG PENG (author) / YUE QUNLI (author) / ZHU JIE'ER (author) / DENG SHILONG (author)
2020-11-20
Patent
Electronic Resource
Chinese
Frame assembly construction method for upper platform of offshore wind power booster station
European Patent Office | 2024
|Jacket assembly for offshore booster station and offshore booster station
European Patent Office | 2024
|European Patent Office | 2020
|Modular offshore booster station and mounting method thereof
European Patent Office | 2021
|