A platform for research: civil engineering, architecture and urbanism
Fabricated greening retaining wall and construction method thereof
The invention relates to a fabricated greening retaining wall and a construction method thereof, and belongs to the field of geotechnical engineering. The fabricated greening retaining wall comprisesa retaining wall foundation, fabricated H-shaped retaining wall modules, fabricated C-shaped retaining wall modules, post-poured secondary concrete and green plants. According to the fabricated greening retaining wall and the construction method thereof, a fabricated retaining wall module is a prefabricated reinforced concrete member, the retaining wall foundation is a cast-in-place reinforced concrete member, assembly is conducted through on-site hoisting, concrete post-pouring and outward-extending steel bar connection reserving during construction, the construction efficiency is greatly improved, the labor cost is saved, and the quality of the retaining wall is guaranteed; and the green plants can be planted on the top of the retaining wall, so that the retaining wall is green and attractive.
本发明涉及一种装配式绿化挡土墙及其施工方法,属于岩土工程领域。所述的装配式绿化挡土墙包括挡土墙基础、装配式H型挡墙模块、装配式匚字型挡墙模块、后浇二次混凝土和绿色植物。本发明的装配式挡墙模块为预制钢筋混凝土构件,挡土墙基础为现浇钢筋混凝土构件,施工时通过现场吊装、后浇混凝土和预留外伸钢筋连接进行装配,极大地提高了施工效率,节约了人工成本,保证了挡土墙质量,本发明可挡墙顶种植绿色植物,使挡土墙绿色美观。
Fabricated greening retaining wall and construction method thereof
The invention relates to a fabricated greening retaining wall and a construction method thereof, and belongs to the field of geotechnical engineering. The fabricated greening retaining wall comprisesa retaining wall foundation, fabricated H-shaped retaining wall modules, fabricated C-shaped retaining wall modules, post-poured secondary concrete and green plants. According to the fabricated greening retaining wall and the construction method thereof, a fabricated retaining wall module is a prefabricated reinforced concrete member, the retaining wall foundation is a cast-in-place reinforced concrete member, assembly is conducted through on-site hoisting, concrete post-pouring and outward-extending steel bar connection reserving during construction, the construction efficiency is greatly improved, the labor cost is saved, and the quality of the retaining wall is guaranteed; and the green plants can be planted on the top of the retaining wall, so that the retaining wall is green and attractive.
本发明涉及一种装配式绿化挡土墙及其施工方法,属于岩土工程领域。所述的装配式绿化挡土墙包括挡土墙基础、装配式H型挡墙模块、装配式匚字型挡墙模块、后浇二次混凝土和绿色植物。本发明的装配式挡墙模块为预制钢筋混凝土构件,挡土墙基础为现浇钢筋混凝土构件,施工时通过现场吊装、后浇混凝土和预留外伸钢筋连接进行装配,极大地提高了施工效率,节约了人工成本,保证了挡土墙质量,本发明可挡墙顶种植绿色植物,使挡土墙绿色美观。
Fabricated greening retaining wall and construction method thereof
一种装配式绿化挡土墙及其施工方法
ZHANG YANNIAN (author) / ZHANG YUYU (author) / HAI HONG (author) / KANG NAN (author) / WANG TIEYUAN (author) / YAN MINGCHENG (author) / YU YANG (author) / LI ZHIJUN (author) / CHEN ZHIYAN (author) / DU SONGYAN (author)
2020-11-20
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Prefabricated greening counterfort type retaining wall and construction method thereof
European Patent Office | 2023
|Fabricated retaining wall and construction method thereof
European Patent Office | 2022
|