Fabricated self-locking greening retaining wall based on miniature tubular piles and construction method thereof
The invention relates to the technical field of greening retaining walls, and discloses an assembly type self-locking greening retaining wall based on miniature tubular piles, the assembly type self-locking greening retaining wall comprises retaining wall building blocks, positioning piles and pressing assemblies, the positioning piles are sleeved with the multiple retaining wall building blocks, and the retaining wall building blocks on the adjacent positioning piles are arranged in a staggered mode; the pressing assembly is arranged at the top of the positioning pile; the pressing assembly comprises a pressing plate, a first fixing piece and a second fixing piece, the first fixing piece and the second fixing piece are alternately arranged on the top of the positioning pile in the horizontal direction, and the pressing plate presses the first fixing piece and the second fixing piece. The invention further discloses a greening retaining wall construction method which comprises the steps that the construction belt is leveled, and the pile positions of the positioning piles are determined; the positioning piles are driven in, concrete is poured into the positioning piles, the retaining wall building blocks are arranged on the positioning piles in a sleeving mode, the pressing assemblies are installed on the tops of the positioning piles, and the space between the retaining wall and the side slope is filled with backfill soil. The retaining wall is modularized, prefabricated and assembled, the retaining wall units are prefabricated and formed off site and assembled on site, the construction efficiency is improved, and the labor amount of workers is reduced.
本申请涉及绿化挡墙技术领域,公开了一种基于微型管桩装配式自锁绿化挡墙,包括挡墙砌块、定位桩、压紧组件,定位桩上套设有多个挡墙砌块,相邻定位桩上的挡墙砌块交错设置;压紧组件设置于定位桩顶部;压紧组件包括压板、第一固定件和第二固定件,第一固定件和第二固定件沿水平方向交替设于定位桩顶部,压板压紧第一固定件和第二固定件。还公开了一种绿化挡墙施工方法,包括整平施工带,确定定位桩的桩位;打入定位桩,向定位桩内浇筑混凝土,将挡墙砌块套设于定位桩,将压紧组件安装于定位桩顶部,并在挡墙与边坡之间填充回填土。本申请将挡墙模块化、预制化、装配化,挡墙单元在场外预制成型,现场组装,提升了施工效率,减轻工人的劳动量。
Fabricated self-locking greening retaining wall based on miniature tubular piles and construction method thereof
The invention relates to the technical field of greening retaining walls, and discloses an assembly type self-locking greening retaining wall based on miniature tubular piles, the assembly type self-locking greening retaining wall comprises retaining wall building blocks, positioning piles and pressing assemblies, the positioning piles are sleeved with the multiple retaining wall building blocks, and the retaining wall building blocks on the adjacent positioning piles are arranged in a staggered mode; the pressing assembly is arranged at the top of the positioning pile; the pressing assembly comprises a pressing plate, a first fixing piece and a second fixing piece, the first fixing piece and the second fixing piece are alternately arranged on the top of the positioning pile in the horizontal direction, and the pressing plate presses the first fixing piece and the second fixing piece. The invention further discloses a greening retaining wall construction method which comprises the steps that the construction belt is leveled, and the pile positions of the positioning piles are determined; the positioning piles are driven in, concrete is poured into the positioning piles, the retaining wall building blocks are arranged on the positioning piles in a sleeving mode, the pressing assemblies are installed on the tops of the positioning piles, and the space between the retaining wall and the side slope is filled with backfill soil. The retaining wall is modularized, prefabricated and assembled, the retaining wall units are prefabricated and formed off site and assembled on site, the construction efficiency is improved, and the labor amount of workers is reduced.
本申请涉及绿化挡墙技术领域,公开了一种基于微型管桩装配式自锁绿化挡墙,包括挡墙砌块、定位桩、压紧组件,定位桩上套设有多个挡墙砌块,相邻定位桩上的挡墙砌块交错设置;压紧组件设置于定位桩顶部;压紧组件包括压板、第一固定件和第二固定件,第一固定件和第二固定件沿水平方向交替设于定位桩顶部,压板压紧第一固定件和第二固定件。还公开了一种绿化挡墙施工方法,包括整平施工带,确定定位桩的桩位;打入定位桩,向定位桩内浇筑混凝土,将挡墙砌块套设于定位桩,将压紧组件安装于定位桩顶部,并在挡墙与边坡之间填充回填土。本申请将挡墙模块化、预制化、装配化,挡墙单元在场外预制成型,现场组装,提升了施工效率,减轻工人的劳动量。
Fabricated self-locking greening retaining wall based on miniature tubular piles and construction method thereof
一种基于微型管桩装配式自锁绿化挡墙及其施工方法
LIANG YAO (author) / SONG CHUAN (author) / LI YUXIANG (author) / TANG XIAOBO (author) / REN JIAN (author) / WU BING (author) / YUAN LIGANG (author) / WU WEI (author) / LI WEI (author)
2024-01-09
Patent
Electronic Resource
Chinese
Fabricated greening retaining wall and construction method thereof
European Patent Office | 2020
|European Patent Office | 2022
|Prefabricated greening counterfort type retaining wall and construction method thereof
European Patent Office | 2023
|