Integrated leakage-free construction scheme for roof heat preservation slope
An integrated leakage-free construction scheme for a roof heat preservation slope comprises the following steps that firstly, a roof is cleaned up, so that the roof is free of impurities, and then theroof is flushed with water till the roof is flushed up; anti-leakage treatment is performed on a reserved hole of the roof; before a roof is dry, a layer of insulation board is laid on the roof to form an insulation layer, and cementing cement paste needs to be coated in advance when the insulation board is laid; and a concrete protective layer is poured on the heat preservation layer. Accordingto the invention, a layer of insulation board is laid on the roof with certain humidity, so that a gap can be effectively prevented from being formed between the insulation board and the roof, water entering the roof cannot flow all around after a certain part of the roof leaks water, and the phenomenon of water mixing caused by local water leakage of the roof can be reduced to the maximum extent;before the heat preservation layer is laid, the reserved hole is subjected to anti-leakage treatment firstly, and it is guaranteed that no leakage phenomenon is generated at the position of the reserved hole.
一种楼顶屋面保温斜坡一体化无渗漏施工方案,包括以下步骤:先把楼顶屋面清理打扫干净,使屋面无杂物,然后用水对楼顶屋面进行冲洗,直到冲洗干净;对楼顶屋面的预留洞口做防渗漏处理;在楼顶屋面未干之前,在楼顶屋面铺设一层保温板,形成保温层,所述保温板在铺设时需预先涂贴胶结水泥浆;在保温层上方浇筑一层混凝土保护层。此发明通过在具有一定湿度的楼顶屋面铺设一层保温板,能够有效地避免保温板与楼顶屋面之间形成间隙,在楼顶屋面某一个局部漏水后,进入的水不会四处流动,能够最大限度地降低楼顶屋面局部漏水而导致的串水现象;在铺设保温层之前,先对预留洞口进行防渗漏处理,确保预留洞口位置处不会产生渗漏现象。
Integrated leakage-free construction scheme for roof heat preservation slope
An integrated leakage-free construction scheme for a roof heat preservation slope comprises the following steps that firstly, a roof is cleaned up, so that the roof is free of impurities, and then theroof is flushed with water till the roof is flushed up; anti-leakage treatment is performed on a reserved hole of the roof; before a roof is dry, a layer of insulation board is laid on the roof to form an insulation layer, and cementing cement paste needs to be coated in advance when the insulation board is laid; and a concrete protective layer is poured on the heat preservation layer. Accordingto the invention, a layer of insulation board is laid on the roof with certain humidity, so that a gap can be effectively prevented from being formed between the insulation board and the roof, water entering the roof cannot flow all around after a certain part of the roof leaks water, and the phenomenon of water mixing caused by local water leakage of the roof can be reduced to the maximum extent;before the heat preservation layer is laid, the reserved hole is subjected to anti-leakage treatment firstly, and it is guaranteed that no leakage phenomenon is generated at the position of the reserved hole.
一种楼顶屋面保温斜坡一体化无渗漏施工方案,包括以下步骤:先把楼顶屋面清理打扫干净,使屋面无杂物,然后用水对楼顶屋面进行冲洗,直到冲洗干净;对楼顶屋面的预留洞口做防渗漏处理;在楼顶屋面未干之前,在楼顶屋面铺设一层保温板,形成保温层,所述保温板在铺设时需预先涂贴胶结水泥浆;在保温层上方浇筑一层混凝土保护层。此发明通过在具有一定湿度的楼顶屋面铺设一层保温板,能够有效地避免保温板与楼顶屋面之间形成间隙,在楼顶屋面某一个局部漏水后,进入的水不会四处流动,能够最大限度地降低楼顶屋面局部漏水而导致的串水现象;在铺设保温层之前,先对预留洞口进行防渗漏处理,确保预留洞口位置处不会产生渗漏现象。
Integrated leakage-free construction scheme for roof heat preservation slope
一种楼顶屋面保温斜坡一体化无渗漏施工方案
AN ZENGMAI (author)
2020-11-20
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Roof heat preservation and slope finding integrated construction method
European Patent Office | 2023
|European Patent Office | 2024
|Roof waterproof and heat preservation integrated construction method
European Patent Office | 2024
|Heat preservation and steam exhaust device for roof leakage treatment and construction method
European Patent Office | 2023
|Roof waterproof heat preservation protection integrated structure and construction technology