Construction method of combination of wooden trestle and sunken green spaces
The invention provides a construction method of a combination of a wooden trestle and sunken green spaces. The construction method comprises the steps of ramming plain soil, laying permeable pipes, laying graded broken stones, and then setting out wooden keels; after determining positions of the wooden keels, laying medium soil and vegetations between the adjacent wooden keels; after laying the vegetations, pouring concrete under the wooden keels, then placing the wooden keels, and laying merbau planks on the wooden keels; after laying the merbau planks, arranging sunken green spaces on one side or both sides of the wooden trestle. According to the construction method, by using the arrangement of ecological grass swales and the sunken green spaces, rainwater is collected and purified for various green plants, the drainage of rainwater is reduced, surrounding pipe networks, structures and water bodies are protected, the waste of water resources is reduced, and the utilization efficiencyof water resources is improved.
本发明提出了一种木栈道与下沉式绿地相结合的施工方法,包括:将素土进行夯实,铺设透水管,铺设级配碎石,之后进行木龙骨放线;在木龙骨位置确定后,在相邻的木龙骨之间铺设介质土及植被;植被铺设完成后,进行木龙骨下方的混凝土浇筑,然后放置木龙骨,并在木龙骨上铺设菠萝格木板;菠萝格木板铺设完成后,在木栈道的其中一侧或者两侧布置下沉式绿地。本发明通过利用生态植草沟及下沉式绿地的设置,将雨水进行收集、净化等,用于各种绿植,减少了雨水的外排,对周边管网、构筑物及水体进行了保护,减少了水资源的浪费,提高了水资源的利用效率。
Construction method of combination of wooden trestle and sunken green spaces
The invention provides a construction method of a combination of a wooden trestle and sunken green spaces. The construction method comprises the steps of ramming plain soil, laying permeable pipes, laying graded broken stones, and then setting out wooden keels; after determining positions of the wooden keels, laying medium soil and vegetations between the adjacent wooden keels; after laying the vegetations, pouring concrete under the wooden keels, then placing the wooden keels, and laying merbau planks on the wooden keels; after laying the merbau planks, arranging sunken green spaces on one side or both sides of the wooden trestle. According to the construction method, by using the arrangement of ecological grass swales and the sunken green spaces, rainwater is collected and purified for various green plants, the drainage of rainwater is reduced, surrounding pipe networks, structures and water bodies are protected, the waste of water resources is reduced, and the utilization efficiencyof water resources is improved.
本发明提出了一种木栈道与下沉式绿地相结合的施工方法,包括:将素土进行夯实,铺设透水管,铺设级配碎石,之后进行木龙骨放线;在木龙骨位置确定后,在相邻的木龙骨之间铺设介质土及植被;植被铺设完成后,进行木龙骨下方的混凝土浇筑,然后放置木龙骨,并在木龙骨上铺设菠萝格木板;菠萝格木板铺设完成后,在木栈道的其中一侧或者两侧布置下沉式绿地。本发明通过利用生态植草沟及下沉式绿地的设置,将雨水进行收集、净化等,用于各种绿植,减少了雨水的外排,对周边管网、构筑物及水体进行了保护,减少了水资源的浪费,提高了水资源的利用效率。
Construction method of combination of wooden trestle and sunken green spaces
木栈道与下沉式绿地相结合的施工方法
LI ZHI (author) / XIA YING (author) / YI XINHU (author) / ZHENG TAO (author) / LIAO HONGYU (author) / WANG JINLONG (author)
2020-11-24
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1881
|A large wooden trestle at McGill, Nevada
Engineering Index Backfile | 1908
|Wooden trestle replaced piecemeal by concrete structure
Engineering Index Backfile | 1918