Wooden trestle construction process
The invention discloses a wood trestle construction process. The construction process comprises the following steps of: preparing for construction, performing wood receiving inspection, and constructing a wood trestle structure. Mounting longitudinal main wood beams and transverse wood beams are included to form a bridge floor foundation; wood beam mortises and angle steel at the bottoms of the longitudinal main wood beams are fixedly mounted; handrails and stand columns are combined and connected at the bridge floor foundation, and then the stand columns are installed and fixed through bolts;and wooden face plates are mounted, and inclined strut assembly is conducted on the handrails. According to the wood trestle construction process, the structural strength of a wood trestle is significantly improved.
本发明公开了一种木栈桥施工工艺,该施工工艺包括以下步骤:施工准备,进行木材进场检验,对木栈桥结构施工,包括安装纵向主木梁、横向木梁形成桥面基础;在纵向主木梁底部的木梁榫卯及角钢固定安装;在桥面基础处实施栏杆和立柱组合连接,随后立柱安装并螺栓固定;实施木质面板安装,并在所述栏杆上实施斜撑组装;上述木栈桥施工工艺显著提升了木栈桥的结构强度。
Wooden trestle construction process
The invention discloses a wood trestle construction process. The construction process comprises the following steps of: preparing for construction, performing wood receiving inspection, and constructing a wood trestle structure. Mounting longitudinal main wood beams and transverse wood beams are included to form a bridge floor foundation; wood beam mortises and angle steel at the bottoms of the longitudinal main wood beams are fixedly mounted; handrails and stand columns are combined and connected at the bridge floor foundation, and then the stand columns are installed and fixed through bolts;and wooden face plates are mounted, and inclined strut assembly is conducted on the handrails. According to the wood trestle construction process, the structural strength of a wood trestle is significantly improved.
本发明公开了一种木栈桥施工工艺,该施工工艺包括以下步骤:施工准备,进行木材进场检验,对木栈桥结构施工,包括安装纵向主木梁、横向木梁形成桥面基础;在纵向主木梁底部的木梁榫卯及角钢固定安装;在桥面基础处实施栏杆和立柱组合连接,随后立柱安装并螺栓固定;实施木质面板安装,并在所述栏杆上实施斜撑组装;上述木栈桥施工工艺显著提升了木栈桥的结构强度。
Wooden trestle construction process
木栈桥施工工艺
DAI GUODONG (author) / WU JING (author)
2020-12-08
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Engineering Index Backfile | 1881
|A large wooden trestle at McGill, Nevada
Engineering Index Backfile | 1908
|Wooden trestle replaced piecemeal by concrete structure
Engineering Index Backfile | 1918
Wooden trestle speeds construction of multiple-arch reinforced concrete highway bridge
Engineering Index Backfile | 1930
|Construction method of combination of wooden trestle and sunken green spaces
European Patent Office | 2020
|