A platform for research: civil engineering, architecture and urbanism
Existing silo top additionally-built structure and existing silo top additional building method
The invention provides an existing silo top additionally-built structure and an existing silo top additional building method. The existing silo top additionally-built structure is additionally built on an existing silo, and the existing silo comprises silo bodies and bottom frames arranged on the ground; the bottom frames comprise first bottom frames and second bottom frames, and the first bottomframes are located on the peripheral sides of the second bottom frames; the silo bodies are connected to the upper portions of the first bottom frames and comprise reinforced concrete piers, anchor bolts, latticed columns and trusses, and the reinforced concrete piers are fixedly arranged on the second bottom frames; and one ends of the anchor bolts are arranged in the reinforced concrete piers inan buried mode, the lower ends of the latticed columns are fixedly connected with the other ends of the anchor bolts, the upper ends of the latticed columns penetrate through the silo bodies, and thetrusses are connected to the upper ends of the latticed columns and located above the silo bodies. The existing silo top additionally-built structure has the characteristics of being economical and safe.
本发明提供了既有筒仓顶部加建结构及既有筒仓顶部加建方法,其中,既有筒仓顶部加建结构加建于既有筒仓上,所述既有筒仓包括筒仓仓身及设置于地面上的底部框架,所述底部框架包括第一底部框架及第二底部框架,所述第一底部框架位于所述第二底部框架的外周侧,所述筒仓仓身连接于所述第一底部框架的上方,包括钢筋混凝土墩、锚栓、格构柱及桁架,所述钢筋混凝土墩固定设置于所述第二底部框架上,所述锚栓的一端埋设于所述钢筋混凝土墩内,所述格构柱的下端与所述锚栓的另一端固定连接,所述格构柱的上端贯穿所述筒仓仓身,所述桁架连接于所述格构柱的上端并位于所述筒仓仓身的上方。本发明的既有筒仓顶部加建结构具有经济且安全的特点。
Existing silo top additionally-built structure and existing silo top additional building method
The invention provides an existing silo top additionally-built structure and an existing silo top additional building method. The existing silo top additionally-built structure is additionally built on an existing silo, and the existing silo comprises silo bodies and bottom frames arranged on the ground; the bottom frames comprise first bottom frames and second bottom frames, and the first bottomframes are located on the peripheral sides of the second bottom frames; the silo bodies are connected to the upper portions of the first bottom frames and comprise reinforced concrete piers, anchor bolts, latticed columns and trusses, and the reinforced concrete piers are fixedly arranged on the second bottom frames; and one ends of the anchor bolts are arranged in the reinforced concrete piers inan buried mode, the lower ends of the latticed columns are fixedly connected with the other ends of the anchor bolts, the upper ends of the latticed columns penetrate through the silo bodies, and thetrusses are connected to the upper ends of the latticed columns and located above the silo bodies. The existing silo top additionally-built structure has the characteristics of being economical and safe.
本发明提供了既有筒仓顶部加建结构及既有筒仓顶部加建方法,其中,既有筒仓顶部加建结构加建于既有筒仓上,所述既有筒仓包括筒仓仓身及设置于地面上的底部框架,所述底部框架包括第一底部框架及第二底部框架,所述第一底部框架位于所述第二底部框架的外周侧,所述筒仓仓身连接于所述第一底部框架的上方,包括钢筋混凝土墩、锚栓、格构柱及桁架,所述钢筋混凝土墩固定设置于所述第二底部框架上,所述锚栓的一端埋设于所述钢筋混凝土墩内,所述格构柱的下端与所述锚栓的另一端固定连接,所述格构柱的上端贯穿所述筒仓仓身,所述桁架连接于所述格构柱的上端并位于所述筒仓仓身的上方。本发明的既有筒仓顶部加建结构具有经济且安全的特点。
Existing silo top additionally-built structure and existing silo top additional building method
既有筒仓顶部加建结构及既有筒仓顶部加建方法
YANG FENGPING (author) / ZHANG TONGWEI (author) / XIE ZHANGHUI (author) / LIU LIANG (author) / ZHOU SHUDONG (author) / YAN MAN (author) / DENG ZHIJUN (author) / NI HONGFEI (author) / LIU YUCHUN (author) / NAN NAN (author)
2020-11-24
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for additionally arranging basement in situ in existing connected silo
European Patent Office | 2023
|SILO, SILO SYSTEM AND SOLID FUEL DISCHARGE METHOD OF SILO
European Patent Office | 2019
|