The invention discloses a construction method for a raft and a post-cast strip of a basement exterior wall. The construction method comprises the following steps: step S1 of sealing the raft and the post-cast strip of the basement exterior wall; step S2 of arranging a waterproof coiled material and a coiled material protective layer on the sealed post-cast strip; step S3 of judging whether concrete of the basement exterior wall meets design strength requirements or not, performing fat slot construction if the concrete meets the design strength requirements, otherwise, continuing to wait. Compared with the prior art, the construction method for the raft and the post-cast strip of the basement exterior wall provided by the invention can seal the raft and the post-cast strip of the basement exterior wall, effectively shortens technical interval time needed for the original post-cast strip pouring, dismounting and curing process, effectively improves construction efficiency of the post-cast strip, can perform waterproof construction and fat slot construction on the sealed post-cast strip in advance by an operator, and finally effectively improves integral construction efficiency.
本发明公开了一种筏板及地下室外墙后浇带的施工方法,包括:步骤S1,封堵筏板及地下室外墙的后浇带;步骤S2,在封堵后的后浇带上设置防水卷材和卷材保护层;步骤S3,判断地下室外墙的混凝土是否符合设计强度要求,若是,则进行肥槽施工;若否,则继续等待。相比于现有技术,本发明所提供的筏板及地下室外墙后浇带的施工方法,通过对筏板及地下室外墙的后浇带进行封堵,有效缩短了原本后浇带浇筑和拆模养护过程所需的技术间隔时间,有效提高了后浇带施工效率。也即操作人员可以提前在被封堵的后浇带上进行防水施工以及肥槽施工,最终可有效提高整体施工效率。
Construction method for raft and post-cast strip of basement exterior wall
The invention discloses a construction method for a raft and a post-cast strip of a basement exterior wall. The construction method comprises the following steps: step S1 of sealing the raft and the post-cast strip of the basement exterior wall; step S2 of arranging a waterproof coiled material and a coiled material protective layer on the sealed post-cast strip; step S3 of judging whether concrete of the basement exterior wall meets design strength requirements or not, performing fat slot construction if the concrete meets the design strength requirements, otherwise, continuing to wait. Compared with the prior art, the construction method for the raft and the post-cast strip of the basement exterior wall provided by the invention can seal the raft and the post-cast strip of the basement exterior wall, effectively shortens technical interval time needed for the original post-cast strip pouring, dismounting and curing process, effectively improves construction efficiency of the post-cast strip, can perform waterproof construction and fat slot construction on the sealed post-cast strip in advance by an operator, and finally effectively improves integral construction efficiency.
本发明公开了一种筏板及地下室外墙后浇带的施工方法,包括:步骤S1,封堵筏板及地下室外墙的后浇带;步骤S2,在封堵后的后浇带上设置防水卷材和卷材保护层;步骤S3,判断地下室外墙的混凝土是否符合设计强度要求,若是,则进行肥槽施工;若否,则继续等待。相比于现有技术,本发明所提供的筏板及地下室外墙后浇带的施工方法,通过对筏板及地下室外墙的后浇带进行封堵,有效缩短了原本后浇带浇筑和拆模养护过程所需的技术间隔时间,有效提高了后浇带施工效率。也即操作人员可以提前在被封堵的后浇带上进行防水施工以及肥槽施工,最终可有效提高整体施工效率。
Construction method for raft and post-cast strip of basement exterior wall
一种筏板及地下室外墙后浇带的施工方法
FENG YIHAN (author) / XIAO HAN (author) / ZHU DI (author) / JIN GUO (author) / ZHOU PENGYUAN (author)
2020-11-27
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Construction method for closing basement exterior wall post-cast strip
European Patent Office | 2015
|European Patent Office | 2024
|Basement exterior wall post-cast strip structure and construction method thereof
European Patent Office | 2021
|Basement exterior wall post-cast strip steel plate sealing construction method
European Patent Office | 2024
|