Hanging basket moving system
The invention provides a hanging basket moving system, a hanging basket comprises a bailey truss longitudinal beam and a bailey truss cross beam, the hanging basket moving system comprises a cross beam movingrail arranged between the bailey truss cross beam and the bailey truss longitudinal beam, a slider arranged at the bottom of the bailey truss cross beam and a first power mechanism, and the slider and the cross beam moving rail are matched and can slide relatively. The first power mechanism is used for being connected with the Bailey truss cross beam and pulling the Bailey truss cross beamto move along the cross beam moving rail; The hanging basket moving system further comprises a longitudinal beam moving rail arranged at the bottom of the bailey truss longitudinal beam and a secondpower mechanism. The longitudinal beam moving rail extends in the length direction of the bailey truss longitudinal beam. The second power mechanism is used for being connected with the bailey truss longitudinal beam and pulling the bailey truss longitudinal beam to move along the longitudinal beam moving rail. After a single bridge block segment is hoisted, rapid movement of the Bailey truss cross beam can be achieved through the power mechanism, hoisting of the next bridge block segment is conducted, the construction efficiency is high, consumed construction time is short, and the influenceon navigation of a navigation channel is small.
本申请提供一种挂篮移动系统,挂篮包括贝雷架纵梁及贝雷架横梁,挂篮移动系统包括:设于贝雷架横梁与贝雷架纵梁之间的横梁移动轨道、设于贝雷架横梁底部的滑移器以及第一动力机构,滑移器与横梁移动轨道适配并可相对滑动,第一动力机构用于与贝雷架横梁连接并用于牵引所贝雷架横梁沿横梁移动轨道移动;还包括设于贝雷架纵梁底部的纵梁移动轨道及第二动力机构,纵梁移动轨道沿贝雷架纵梁的长度方向延伸,第二动力机构用于与贝雷架纵梁连接并用于牵引贝雷架纵梁沿纵梁移动轨道移动。在吊装单个桥梁块段后,通过动力机构即可实现贝雷架横梁的快速移动,并进行下一个桥梁块段的吊装,施工效率高,耗费的施工时间短,对航道的通航影响小。
Hanging basket moving system
The invention provides a hanging basket moving system, a hanging basket comprises a bailey truss longitudinal beam and a bailey truss cross beam, the hanging basket moving system comprises a cross beam movingrail arranged between the bailey truss cross beam and the bailey truss longitudinal beam, a slider arranged at the bottom of the bailey truss cross beam and a first power mechanism, and the slider and the cross beam moving rail are matched and can slide relatively. The first power mechanism is used for being connected with the Bailey truss cross beam and pulling the Bailey truss cross beamto move along the cross beam moving rail; The hanging basket moving system further comprises a longitudinal beam moving rail arranged at the bottom of the bailey truss longitudinal beam and a secondpower mechanism. The longitudinal beam moving rail extends in the length direction of the bailey truss longitudinal beam. The second power mechanism is used for being connected with the bailey truss longitudinal beam and pulling the bailey truss longitudinal beam to move along the longitudinal beam moving rail. After a single bridge block segment is hoisted, rapid movement of the Bailey truss cross beam can be achieved through the power mechanism, hoisting of the next bridge block segment is conducted, the construction efficiency is high, consumed construction time is short, and the influenceon navigation of a navigation channel is small.
本申请提供一种挂篮移动系统,挂篮包括贝雷架纵梁及贝雷架横梁,挂篮移动系统包括:设于贝雷架横梁与贝雷架纵梁之间的横梁移动轨道、设于贝雷架横梁底部的滑移器以及第一动力机构,滑移器与横梁移动轨道适配并可相对滑动,第一动力机构用于与贝雷架横梁连接并用于牵引所贝雷架横梁沿横梁移动轨道移动;还包括设于贝雷架纵梁底部的纵梁移动轨道及第二动力机构,纵梁移动轨道沿贝雷架纵梁的长度方向延伸,第二动力机构用于与贝雷架纵梁连接并用于牵引贝雷架纵梁沿纵梁移动轨道移动。在吊装单个桥梁块段后,通过动力机构即可实现贝雷架横梁的快速移动,并进行下一个桥梁块段的吊装,施工效率高,耗费的施工时间短,对航道的通航影响小。
Hanging basket moving system
挂篮移动系统
LIU ZHENCHUAN (author) / LIU JINWEI (author) / HE CHUANFENG (author) / BAN SHENGJUN (author) / LI GANG (author) / CHEN XIAOLONG (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction hanging basket structure and hanging basket moving method
European Patent Office | 2024
|Automatic walking system for moving hanging basket truss and track of hanging basket truss
European Patent Office | 2023
|