A platform for research: civil engineering, architecture and urbanism
Flood season drainage riverbed laying structure and application method thereof
The invention discloses a flood season drainage riverbed laying structure and an application method thereof, and belongs to the technical field of building drainage. The flood season drainage riverbedlaying structure comprises a riverbed structure and a bearing channel structure; the riverbed structure comprises a river channel and a river located in the river channel, and the river has a river water level and a warning water level; the bearing channel structure is arranged, and the bearing channel structure is arranged at the bottom of the riverbed structure; and when the river water level exceeds the warning water level, the bearing channel structure is automatically opened, and when the river water level is lower than the warning water level, the bearing channel structure is automatically closed. According to the device, by arranging the bearing channel structure at the bottom of the riverbed structure, the bearing channel structure can serve as an auxiliary drainage channel of theriver channel and is automatically opened when the water level exceeds the warning water level, so that the water level is effectively reduced, and the bearing capacity of the riverbed structure is increased on the basis that land occupation is reduced; and meanwhile, the bearing channel structure is automatically closed when the water level is lower than the warning water level, so that the bottom of the riverbed structure is kept in an initial state, and it is guaranteed that the water level in the river channel is located at the height serving as a navigation channel, ecological landscapeand the like.
本发明公开了汛期排水河床铺设结构及其应用方法,属于建筑排水技术领域。包括河床结构,河床结构包括河道及位于河道内的河流;河流具有河流水位以及警示水位;承载通道结构;承载通道结构设于河床结构的底部;在河流水位超出警示水位时,承载通道结构自动开启;在河流水位低于警示水位时,承载通道结构自动闭合。该装置能够通过在河床结构的底部设置承载通道结构,使承载通道结构能够作为河道的辅助型排水通道,在水位超出警示水位时自动开启,有效降低水位,在减少陆地占用的基础上增加了河床结构的承载量;同时能够在水位低于警示水位时自动闭合,使河床结构的底部维持初始状态,保证河道内的水位处于可作为航道、生态景观等的高度。
Flood season drainage riverbed laying structure and application method thereof
The invention discloses a flood season drainage riverbed laying structure and an application method thereof, and belongs to the technical field of building drainage. The flood season drainage riverbedlaying structure comprises a riverbed structure and a bearing channel structure; the riverbed structure comprises a river channel and a river located in the river channel, and the river has a river water level and a warning water level; the bearing channel structure is arranged, and the bearing channel structure is arranged at the bottom of the riverbed structure; and when the river water level exceeds the warning water level, the bearing channel structure is automatically opened, and when the river water level is lower than the warning water level, the bearing channel structure is automatically closed. According to the device, by arranging the bearing channel structure at the bottom of the riverbed structure, the bearing channel structure can serve as an auxiliary drainage channel of theriver channel and is automatically opened when the water level exceeds the warning water level, so that the water level is effectively reduced, and the bearing capacity of the riverbed structure is increased on the basis that land occupation is reduced; and meanwhile, the bearing channel structure is automatically closed when the water level is lower than the warning water level, so that the bottom of the riverbed structure is kept in an initial state, and it is guaranteed that the water level in the river channel is located at the height serving as a navigation channel, ecological landscapeand the like.
本发明公开了汛期排水河床铺设结构及其应用方法,属于建筑排水技术领域。包括河床结构,河床结构包括河道及位于河道内的河流;河流具有河流水位以及警示水位;承载通道结构;承载通道结构设于河床结构的底部;在河流水位超出警示水位时,承载通道结构自动开启;在河流水位低于警示水位时,承载通道结构自动闭合。该装置能够通过在河床结构的底部设置承载通道结构,使承载通道结构能够作为河道的辅助型排水通道,在水位超出警示水位时自动开启,有效降低水位,在减少陆地占用的基础上增加了河床结构的承载量;同时能够在水位低于警示水位时自动闭合,使河床结构的底部维持初始状态,保证河道内的水位处于可作为航道、生态景观等的高度。
Flood season drainage riverbed laying structure and application method thereof
汛期排水河床铺设结构及其应用方法
SUN HONGTAO (author) / MA YU (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Comprehensive structure integrating flood control, flood drainage and underground pipeline laying
European Patent Office | 2021
|Riverbed fixed distribution structure and riverbed fixed analysis method
European Patent Office | 2022
|