A platform for research: civil engineering, architecture and urbanism
Construction process of tool type steel lattice column lifting frame for high-altitude integral lifting large-span integral assembling welding ball net frame
The invention discloses a construction process of a tool type steel lattice column lifting frame for high-altitude integral lifting large-span integral assembling welding ball net frame. The construction process comprises the following steps of (1) net frame construction; and (2) integral lifting of a pulling rod of the net frame. The process has the advantages of being convenient to operate, highin construction speed, excellent in quality, capable of saving labor and the like, the requirements for energy conservation and environmental protection are met, and no safety and quality problems occur in the construction process. According to the construction method, a traditional net frame lifting construction method is technically innovated, an advanced construction method is provided for building construction, and good social benefits are achieved.
本发明公开了一种工具式钢格构柱提升架高空整体提升大跨度整体拼装焊接球网架施工艺,包括下列步骤:(一)网架施工;(二)网架的“拔杆”整体吊装。本发明的工艺具有操作方便、施工速度快、质量优良、节约人工等优点,符合节能和环保要求,施工中没有出现过任何安全和质量问题。该施工工法对传统网架吊装施工方法,进行了技术创新,为建筑施工提供了先进的施工方法,具有较好的社会效益。
Construction process of tool type steel lattice column lifting frame for high-altitude integral lifting large-span integral assembling welding ball net frame
The invention discloses a construction process of a tool type steel lattice column lifting frame for high-altitude integral lifting large-span integral assembling welding ball net frame. The construction process comprises the following steps of (1) net frame construction; and (2) integral lifting of a pulling rod of the net frame. The process has the advantages of being convenient to operate, highin construction speed, excellent in quality, capable of saving labor and the like, the requirements for energy conservation and environmental protection are met, and no safety and quality problems occur in the construction process. According to the construction method, a traditional net frame lifting construction method is technically innovated, an advanced construction method is provided for building construction, and good social benefits are achieved.
本发明公开了一种工具式钢格构柱提升架高空整体提升大跨度整体拼装焊接球网架施工艺,包括下列步骤:(一)网架施工;(二)网架的“拔杆”整体吊装。本发明的工艺具有操作方便、施工速度快、质量优良、节约人工等优点,符合节能和环保要求,施工中没有出现过任何安全和质量问题。该施工工法对传统网架吊装施工方法,进行了技术创新,为建筑施工提供了先进的施工方法,具有较好的社会效益。
Construction process of tool type steel lattice column lifting frame for high-altitude integral lifting large-span integral assembling welding ball net frame
工具式钢格构柱提升架高空整体提升大跨度整体拼装焊接球网架施工艺
LI XIAOLONG (author) / XU SHAOQIANG (author) / REN CHANGCHENG (author) / JIA FENGJIE (author) / WANG CUIGANG (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2024
|Integral lifting type peripheral protection hanging frame and lifting method
European Patent Office | 2021
|Large-span welded ball net rack ground assembly integral lifting construction method
European Patent Office | 2021
|