Vertical alternative construction method for high-rise building
The invention relates to a vertical alternative construction method for a high-rise building. The vertical alternative construction method specifically comprises the following steps of 1, completing N-layer horizontal structure surveying and setting-out and N-layer vertical structure masonry engineering; 2, starting to implement N-layer horizontal structure formwork engineering and steel bar engineering, and completing (N+1)-layer vertical structure steel bar engineering at the same time; 3, completing N-layer horizontal structure concrete engineering and (N+1)-layer vertical structure concrete engineering, and completing (N-1)-layer horizontal structure formwork removal construction at the same time; 4, after the first round of maintenance of an N-layer transverse structure is completed,enabling construction equipment to climb up by one layer, and conducting (N+1)-layer horizontal structure surveying and setting-out and vertical structure masonry engineering; and step 5, repeating the steps 2-4 to carry out a new round of floor construction. According to the vertical alternative construction method, the high-rise building construction efficiency can be improved, double-floor alternative synchronous construction is adopted during floor main body structure construction, the labor cost and the time cost can be greatly reduced, and the operability is high.
本发明涉及一种高层建筑竖向穿插施工方法,一种高层建筑竖向穿插施工方法,具体包括以下步骤:步骤1:完成N层水平结构测量放线和N层竖向结构砌筑工程;步骤2:启动实施N层水平结构模板工程和钢筋工程,同时完成N+1层竖向结构的钢筋工程;步骤3:完成N层水平结构混凝土工程和N+1层竖向结构的混凝土工程,同时完成N‑1层水平结构拆模施工;步骤4:N层横向结构第一轮养护完成,施工设备爬升一层,同时N+1层水平结构进行测量放线和竖向结构实施砌筑工程;步骤5:重复步骤2‑4进行新一轮楼层施工。本发明可以提高高层建筑施工效率,楼层主体结构施工时采用双楼层穿插式同步施工,可大量减少人力成本和时间成本,可操作强。
Vertical alternative construction method for high-rise building
The invention relates to a vertical alternative construction method for a high-rise building. The vertical alternative construction method specifically comprises the following steps of 1, completing N-layer horizontal structure surveying and setting-out and N-layer vertical structure masonry engineering; 2, starting to implement N-layer horizontal structure formwork engineering and steel bar engineering, and completing (N+1)-layer vertical structure steel bar engineering at the same time; 3, completing N-layer horizontal structure concrete engineering and (N+1)-layer vertical structure concrete engineering, and completing (N-1)-layer horizontal structure formwork removal construction at the same time; 4, after the first round of maintenance of an N-layer transverse structure is completed,enabling construction equipment to climb up by one layer, and conducting (N+1)-layer horizontal structure surveying and setting-out and vertical structure masonry engineering; and step 5, repeating the steps 2-4 to carry out a new round of floor construction. According to the vertical alternative construction method, the high-rise building construction efficiency can be improved, double-floor alternative synchronous construction is adopted during floor main body structure construction, the labor cost and the time cost can be greatly reduced, and the operability is high.
本发明涉及一种高层建筑竖向穿插施工方法,一种高层建筑竖向穿插施工方法,具体包括以下步骤:步骤1:完成N层水平结构测量放线和N层竖向结构砌筑工程;步骤2:启动实施N层水平结构模板工程和钢筋工程,同时完成N+1层竖向结构的钢筋工程;步骤3:完成N层水平结构混凝土工程和N+1层竖向结构的混凝土工程,同时完成N‑1层水平结构拆模施工;步骤4:N层横向结构第一轮养护完成,施工设备爬升一层,同时N+1层水平结构进行测量放线和竖向结构实施砌筑工程;步骤5:重复步骤2‑4进行新一轮楼层施工。本发明可以提高高层建筑施工效率,楼层主体结构施工时采用双楼层穿插式同步施工,可大量减少人力成本和时间成本,可操作强。
Vertical alternative construction method for high-rise building
一种高层建筑竖向穿插施工方法
YOU SHUNTAO (author) / SHI XIANGFEI (author) / WANG YUWEI (author) / WANG WEIJIAN (author)
2020-12-08
Patent
Electronic Resource
Chinese
Vertical transportation method for high-rise fabricated building construction
European Patent Office | 2024
|Vertical deformation construction monitoring method for super high-rise building
European Patent Office | 2021
|Vertical transportation system for middle and high-rise building construction
European Patent Office | 2024
|European Patent Office | 2022
|Construction method for vertical pipe of super high-rise building engineering pipe well
European Patent Office | 2022
|