A platform for research: civil engineering, architecture and urbanism
Pile foundation construction pouring device
The invention discloses a pile foundation construction pouring device. The pile foundation construction pouring device comprises a water blocking pipe, wherein a plurality of elastic pieces are connected to the outer side of a water blocking pipe body; the elastic pieces are connected with movable baffles; the movable baffles are connected with movable blocks; a plurality of baffles are arranged between the movable blocks; a plurality of immersion pipes are arranged below the water blocking pipe; a plurality of conveying pipes are arranged above the water blocking pipe; air pipes are clamped in the side face connection of the water blocking pipe, the immersion pipes and the conveying pipes; air bags are arranged at the lower ends of the air pipes; air pressure meters are arranged at the upper ends of the air pipes; vibration rods are arranged in the conveying pipes; conveying rods are arranged on the two sides of the conveying pipe body; steel reinforcement cage conveying arms are arranged on the vibration rod conveying rods; and a steel reinforcement cage rapid connecting device is further included. According to the device, a steel reinforcement cage can be connected and placed during pouring, a water blocking plug does not need to be consumed, the concrete ascending speed can be automatically adjusted, the immersion depth of a guide pipe does not need to be measured, and concrete is not prone to being accumulated in the guide pipe.
本发明公开了一种桩基施工灌注装置,包括阻水管,所述阻水管体外侧连接有多个弹片,所述弹片连接有活动挡板,所述活动挡板连接有活动块,所述活动块之间有多个挡板,所述阻水管下方安装有若干浸没管,所述阻水管上方安装有若干传输管,所述阻水管、浸没管和传输管的侧面连接中夹有气管,所述气管下端安装有气囊,所述气管上端安装有气压表,所述传输管内部安装有振动杆,所述传输管体两侧安装有输送杆,所述振动杆输送杆上设置有钢筋笼输送臂,还包括钢筋笼快速连接装置;本发明,可以在灌注同时连接并放置钢筋笼、不需要消耗阻水塞、能够自动调节混凝土上升速度、不需要测量导管浸没深度并且混凝土不容易在导管内部堆积。
Pile foundation construction pouring device
The invention discloses a pile foundation construction pouring device. The pile foundation construction pouring device comprises a water blocking pipe, wherein a plurality of elastic pieces are connected to the outer side of a water blocking pipe body; the elastic pieces are connected with movable baffles; the movable baffles are connected with movable blocks; a plurality of baffles are arranged between the movable blocks; a plurality of immersion pipes are arranged below the water blocking pipe; a plurality of conveying pipes are arranged above the water blocking pipe; air pipes are clamped in the side face connection of the water blocking pipe, the immersion pipes and the conveying pipes; air bags are arranged at the lower ends of the air pipes; air pressure meters are arranged at the upper ends of the air pipes; vibration rods are arranged in the conveying pipes; conveying rods are arranged on the two sides of the conveying pipe body; steel reinforcement cage conveying arms are arranged on the vibration rod conveying rods; and a steel reinforcement cage rapid connecting device is further included. According to the device, a steel reinforcement cage can be connected and placed during pouring, a water blocking plug does not need to be consumed, the concrete ascending speed can be automatically adjusted, the immersion depth of a guide pipe does not need to be measured, and concrete is not prone to being accumulated in the guide pipe.
本发明公开了一种桩基施工灌注装置,包括阻水管,所述阻水管体外侧连接有多个弹片,所述弹片连接有活动挡板,所述活动挡板连接有活动块,所述活动块之间有多个挡板,所述阻水管下方安装有若干浸没管,所述阻水管上方安装有若干传输管,所述阻水管、浸没管和传输管的侧面连接中夹有气管,所述气管下端安装有气囊,所述气管上端安装有气压表,所述传输管内部安装有振动杆,所述传输管体两侧安装有输送杆,所述振动杆输送杆上设置有钢筋笼输送臂,还包括钢筋笼快速连接装置;本发明,可以在灌注同时连接并放置钢筋笼、不需要消耗阻水塞、能够自动调节混凝土上升速度、不需要测量导管浸没深度并且混凝土不容易在导管内部堆积。
Pile foundation construction pouring device
一种桩基施工灌注装置
LIN QINGHUA (author) / TAO QIN (author)
2020-12-18
Patent
Electronic Resource
Chinese
Concrete pouring device for pile foundation construction
European Patent Office | 2022
|Pile foundation pouring device and construction method thereof
European Patent Office | 2021
|