A platform for research: civil engineering, architecture and urbanism
Integral steel platform formwork and large tower crane integrated building construction equipment and construction method thereof
The invention discloses integral steel platform formwork and large tower crane integrated building construction equipment and a construction method thereof. The integrated building construction equipment comprises a material stacking platform, a construction machinery integrated platform, supporting cylinder frame structures I, a supporting cylinder frame structure II, a supporting cylinder framestructure III, an integrated platform and a power system; the tops of the supporting cylinder frame structures I are fixed to the material stacking platform, and vertical supporting devices I are arranged at the bottoms of the supporting cylinder frame structures I; the supporting cylinder frame structure II comprises an upper supporting cylinder frame and a lower supporting cylinder frame, the top of the upper supporting cylinder frame is fixed to the bottom of the construction machinery integrated platform, the bottom of the upper supporting cylinder frame and the bottom of the supporting cylinder frame structure III form an integrated structure through the integrated platform, and the top of the supporting cylinder frame structure III is fixed to the bottom of the material stacking platform; and a vertical supporting device II and a vertical supporting device III are arranged on the supporting cylinder frame structure II. According to the integrated building construction equipment,the material stacking platform and the construction machinery integrated platform do not influence each other and climb synchronously, the load transmission is reasonable, and the safety and the construction efficiency are improved.
本发明公开了一种整体钢平台模架与大型塔机集成造楼装备及其施工方法,所述集成造楼装备包括材料堆放平台、施工机械集成平台、支撑筒架结构一、支撑筒架结构二、支撑筒架结构三、一体化平台和动力系统。支撑筒架结构一顶部与材料堆放平台固定,底部设置有竖向支撑装置一;支撑筒架结构二包括上部支撑筒架和下部支撑筒架;上部支撑筒架顶部与施工机械集成平台底部固定,底部通过一体化平台与支撑筒架结构三底部形成一体结构,支撑筒架结构三顶部与材料堆放平台底部固定;支撑筒架结构二上设置有竖向支撑装置二和竖向支撑装置三。该集成造楼装备能够使材料堆放平台、施工机械集成平台互不影响并同步爬升,荷载传递合理,提高了安全性和施工效率。
Integral steel platform formwork and large tower crane integrated building construction equipment and construction method thereof
The invention discloses integral steel platform formwork and large tower crane integrated building construction equipment and a construction method thereof. The integrated building construction equipment comprises a material stacking platform, a construction machinery integrated platform, supporting cylinder frame structures I, a supporting cylinder frame structure II, a supporting cylinder framestructure III, an integrated platform and a power system; the tops of the supporting cylinder frame structures I are fixed to the material stacking platform, and vertical supporting devices I are arranged at the bottoms of the supporting cylinder frame structures I; the supporting cylinder frame structure II comprises an upper supporting cylinder frame and a lower supporting cylinder frame, the top of the upper supporting cylinder frame is fixed to the bottom of the construction machinery integrated platform, the bottom of the upper supporting cylinder frame and the bottom of the supporting cylinder frame structure III form an integrated structure through the integrated platform, and the top of the supporting cylinder frame structure III is fixed to the bottom of the material stacking platform; and a vertical supporting device II and a vertical supporting device III are arranged on the supporting cylinder frame structure II. According to the integrated building construction equipment,the material stacking platform and the construction machinery integrated platform do not influence each other and climb synchronously, the load transmission is reasonable, and the safety and the construction efficiency are improved.
本发明公开了一种整体钢平台模架与大型塔机集成造楼装备及其施工方法,所述集成造楼装备包括材料堆放平台、施工机械集成平台、支撑筒架结构一、支撑筒架结构二、支撑筒架结构三、一体化平台和动力系统。支撑筒架结构一顶部与材料堆放平台固定,底部设置有竖向支撑装置一;支撑筒架结构二包括上部支撑筒架和下部支撑筒架;上部支撑筒架顶部与施工机械集成平台底部固定,底部通过一体化平台与支撑筒架结构三底部形成一体结构,支撑筒架结构三顶部与材料堆放平台底部固定;支撑筒架结构二上设置有竖向支撑装置二和竖向支撑装置三。该集成造楼装备能够使材料堆放平台、施工机械集成平台互不影响并同步爬升,荷载传递合理,提高了安全性和施工效率。
Integral steel platform formwork and large tower crane integrated building construction equipment and construction method thereof
整体钢平台模架与大型塔机集成造楼装备及其施工方法
GONG JIAN (author) / ZHU YIMIN (author) / HUANG YULIN (author) / WANG XIAO'AN (author) / FU XINLI (author) / XU LEI (author) / WANG MINGLIANG (author)
2020-12-18
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|European Patent Office | 2021
|European Patent Office | 2022
|Turnover shaped tower crane foundation steel platform and construction method thereof
European Patent Office | 2024
|