A platform for research: civil engineering, architecture and urbanism
The invention discloses a rail sleeper parallelism raising repairing device. The device comprises a working box, a weighing rod is fixedly installed on the left end face of the working box, an L-shaped plate is fixedly installed on the lower end face of the weighing rod, an auxiliary shaft is rotatably installed on the rear end face of an inner cavity of the L-shaped plate, and the front end faceof the auxiliary shaft is fixedly provided with an auxiliary gear. A sliding groove is fixedly mounted on the left end face of the working box, and a sliding rod is slidably mounted in the sliding groove. After the device is used according to specified requirements, the inclination degree of an outer side rail can be changed through the inclination degree of an inner side rail, the problem that the outer side rail is too low to affect the centripetal force during turning is solved, the rail is raised after detection, the rail is raised to a specified required position, cement is injected belowa sleeper, and the injection angle is adjusted in the process, so that a gap between the sleeper and the ground can be fully filled with the cement.
本发明公开了一种铁轨枕木平行度抬高修复装置,包括工作箱,所述工作箱左端面上固定安装称量杆,所述称量杆下端面固定安装L型板,所述L型板内腔后端面上转动安装辅助轴,所述辅助轴前端面过大在辅助齿轮,所述工作箱左端面固定安装滑槽,所述滑槽中滑动安装滑杆,将本发明按照指定要求使用后,本发明即可通过内侧轨道的倾斜度改变外侧轨道的倾斜度,对外侧轨道过低影响转弯时候的向心力进行解决处理,检测后进行轨道的抬高,抬高到指定要求位置,将水泥注入在枕木下面,在此过程中调节注射的角度,使水泥能够充分填补枕木与地面之间的缝隙。
The invention discloses a rail sleeper parallelism raising repairing device. The device comprises a working box, a weighing rod is fixedly installed on the left end face of the working box, an L-shaped plate is fixedly installed on the lower end face of the weighing rod, an auxiliary shaft is rotatably installed on the rear end face of an inner cavity of the L-shaped plate, and the front end faceof the auxiliary shaft is fixedly provided with an auxiliary gear. A sliding groove is fixedly mounted on the left end face of the working box, and a sliding rod is slidably mounted in the sliding groove. After the device is used according to specified requirements, the inclination degree of an outer side rail can be changed through the inclination degree of an inner side rail, the problem that the outer side rail is too low to affect the centripetal force during turning is solved, the rail is raised after detection, the rail is raised to a specified required position, cement is injected belowa sleeper, and the injection angle is adjusted in the process, so that a gap between the sleeper and the ground can be fully filled with the cement.
本发明公开了一种铁轨枕木平行度抬高修复装置,包括工作箱,所述工作箱左端面上固定安装称量杆,所述称量杆下端面固定安装L型板,所述L型板内腔后端面上转动安装辅助轴,所述辅助轴前端面过大在辅助齿轮,所述工作箱左端面固定安装滑槽,所述滑槽中滑动安装滑杆,将本发明按照指定要求使用后,本发明即可通过内侧轨道的倾斜度改变外侧轨道的倾斜度,对外侧轨道过低影响转弯时候的向心力进行解决处理,检测后进行轨道的抬高,抬高到指定要求位置,将水泥注入在枕木下面,在此过程中调节注射的角度,使水泥能够充分填补枕木与地面之间的缝隙。