A platform for research: civil engineering, architecture and urbanism
Integral jacking construction method for net rack
The invention relates to the field of building construction and mounting, in particular to an integral jacking construction method of a net rack. The integral jacking construction method of the net rack mainly comprises the following steps of steel structure net rack splicing, steel structure grid splicing, steel structure jacking point setting and steel structure net rack jacking system jacking operation. According to the integral jacking construction method of the net rack, safe and stable jacking mounting can be conducted on the net rack structure with larger mass, and the problems that potential safety hazards exist, hoisting accidents are likely to happen, and the mounting and use requirements of people cannot be met when an existing net rack structure with the larger mass is hoistedand mounted are solved. According to the integral jacking construction method of the net rack, the steel structure net rack jacking system is stable in integral mounting and scientific in mounting design, and has a very safe use effect in the use process.
本发明涉及建筑施工安装领域,尤其是涉及一种网架整体顶升施工方法,其主要包括如下步骤:钢结构网架拼装、钢结构网格拼装、钢结构顶升点设置、钢结构网架顶升系统顶升作业,本发明所提供的一种网架整体顶升施工方法能够对较大质量的网架结构进行安全稳定的顶起安装,解决了现有较大质量的网架结构进行起吊安装时存在安全隐患,容易发生吊装事故,不能满足人们的安装使用需求的问题。本发明所提供的网架整体顶升施工方法中的钢结构网架顶升系统整体安装稳固,安装设计科学,在使用过程中具有非常安全的使用效果。
Integral jacking construction method for net rack
The invention relates to the field of building construction and mounting, in particular to an integral jacking construction method of a net rack. The integral jacking construction method of the net rack mainly comprises the following steps of steel structure net rack splicing, steel structure grid splicing, steel structure jacking point setting and steel structure net rack jacking system jacking operation. According to the integral jacking construction method of the net rack, safe and stable jacking mounting can be conducted on the net rack structure with larger mass, and the problems that potential safety hazards exist, hoisting accidents are likely to happen, and the mounting and use requirements of people cannot be met when an existing net rack structure with the larger mass is hoistedand mounted are solved. According to the integral jacking construction method of the net rack, the steel structure net rack jacking system is stable in integral mounting and scientific in mounting design, and has a very safe use effect in the use process.
本发明涉及建筑施工安装领域,尤其是涉及一种网架整体顶升施工方法,其主要包括如下步骤:钢结构网架拼装、钢结构网格拼装、钢结构顶升点设置、钢结构网架顶升系统顶升作业,本发明所提供的一种网架整体顶升施工方法能够对较大质量的网架结构进行安全稳定的顶起安装,解决了现有较大质量的网架结构进行起吊安装时存在安全隐患,容易发生吊装事故,不能满足人们的安装使用需求的问题。本发明所提供的网架整体顶升施工方法中的钢结构网架顶升系统整体安装稳固,安装设计科学,在使用过程中具有非常安全的使用效果。
Integral jacking construction method for net rack
一种网架整体顶升施工方法
YAN CONGYUN (author) / LI XU (author) / LIU JIELIANG (author) / LIU LAIHUI (author) / DING KUANKUAN (author) / SONG DONGQIANG (author) / ZHANG YONG (author) / MA TENGTENG (author) / CHANG XIAOPO (author) / ZHANG XUDONG (author)
2020-12-22
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Large-span net rack external expansion assembly integral jacking construction method
European Patent Office | 2020
|Integral jacking and step-by-step sliding multi-layer net rack construction method
European Patent Office | 2023
|