A platform for research: civil engineering, architecture and urbanism
Fabricated steel structure integrated green building and mounting process thereof
The invention relates to the technical field of buildings, and discloses a fabricated steel structure integrated green building and a mounting process thereof. The fabricated steel structure integrated green building comprises a embedded part; the embedded part is a cuboid plate; a rectangular groove is formed in the upper surface of the embedded part; a pre-tightening mechanism is arranged on theembedded part; and the pre-tightening mechanism comprises a first pipeline, a second sliding block, a first pull rod, a first sliding groove, a first clamping block, a second spring, a downward moving block, a vertical rod, a second connecting rod, a fixing block, and a first vertical rod. The second connecting rod pushes the vertical rod to slide downwards in the first pipeline, and the verticalrod drives the downward moving block to compress hydraulic oil in the first pipeline and pushes the second sliding block to slide in the first pipeline, and the second sliding block drives the firstpull rod to drive the first clamping block to slide out of the first sliding groove to be attached to the side wall surface of the fixing block, so that the fixing block is fixed to the embedded part,the pre-tightening mechanism replaces manual supporting of the first vertical rod, and therefore the manual supporting of the first vertical rod is not needed, so that the probability of deviation ofthe first vertical rod caused by human factors is reduced, the manual workload is reduced, the working efficiency when the embedded part is placed is improved, and the installation precision is improved.
本发明涉及建筑技术领域,且公开了一种装配式钢结构一体化绿色建筑及其安装工艺,包括预埋件,预埋件为长方体板,预埋件上表面开设矩形槽,预埋件上设置预紧机构,预紧机构包括管道一、滑动块二、拉杆一、滑槽一、卡块一、弹簧二、下移块和竖杆,连杆二推动竖杆在管道一内向下滑动,竖杆带动下移块压缩管道一内的液压油并推动滑动块二在管道一内滑动,滑动块二带动拉杆一带动卡块一从滑槽一内滑出与固定块侧壁面贴合,从而使固定块与预埋件固定,通过用预紧机构代替人工扶持竖杆一,由于不需要人工扶持竖杆一,减少人为因素导致竖杆一偏移的几率,降低人工工作量,提高了放置预埋件时的工作效率,提高了安装的精度。
Fabricated steel structure integrated green building and mounting process thereof
The invention relates to the technical field of buildings, and discloses a fabricated steel structure integrated green building and a mounting process thereof. The fabricated steel structure integrated green building comprises a embedded part; the embedded part is a cuboid plate; a rectangular groove is formed in the upper surface of the embedded part; a pre-tightening mechanism is arranged on theembedded part; and the pre-tightening mechanism comprises a first pipeline, a second sliding block, a first pull rod, a first sliding groove, a first clamping block, a second spring, a downward moving block, a vertical rod, a second connecting rod, a fixing block, and a first vertical rod. The second connecting rod pushes the vertical rod to slide downwards in the first pipeline, and the verticalrod drives the downward moving block to compress hydraulic oil in the first pipeline and pushes the second sliding block to slide in the first pipeline, and the second sliding block drives the firstpull rod to drive the first clamping block to slide out of the first sliding groove to be attached to the side wall surface of the fixing block, so that the fixing block is fixed to the embedded part,the pre-tightening mechanism replaces manual supporting of the first vertical rod, and therefore the manual supporting of the first vertical rod is not needed, so that the probability of deviation ofthe first vertical rod caused by human factors is reduced, the manual workload is reduced, the working efficiency when the embedded part is placed is improved, and the installation precision is improved.
本发明涉及建筑技术领域,且公开了一种装配式钢结构一体化绿色建筑及其安装工艺,包括预埋件,预埋件为长方体板,预埋件上表面开设矩形槽,预埋件上设置预紧机构,预紧机构包括管道一、滑动块二、拉杆一、滑槽一、卡块一、弹簧二、下移块和竖杆,连杆二推动竖杆在管道一内向下滑动,竖杆带动下移块压缩管道一内的液压油并推动滑动块二在管道一内滑动,滑动块二带动拉杆一带动卡块一从滑槽一内滑出与固定块侧壁面贴合,从而使固定块与预埋件固定,通过用预紧机构代替人工扶持竖杆一,由于不需要人工扶持竖杆一,减少人为因素导致竖杆一偏移的几率,降低人工工作量,提高了放置预埋件时的工作效率,提高了安装的精度。
Fabricated steel structure integrated green building and mounting process thereof
一种装配式钢结构一体化绿色建筑及其安装工艺
GUO HONGYAN (author)
2020-12-22
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated green building steel structure and mounting process thereof
European Patent Office | 2022
|Fabricated steel structure integrated green building and designing and mounting process thereof
European Patent Office | 2020
|Fabricated steel-wood building structure and mounting process thereof
European Patent Office | 2023
|Prefabricated steel structure integrated green building and mounting method thereof
European Patent Office | 2020
|