A platform for research: civil engineering, architecture and urbanism
The invention discloses a fabricated green building steel structure and a mounting process thereof, and relates to the field of fabricated constructions.The fabricated green building steel structure comprises two supports, a cross beam, two lifting ropes and a seat plate, and the two ends of the cross beam are detachably connected with the upper ends of the two supports correspondingly; the lifting mechanism comprises a driving assembly, a lifting assembly and a control assembly, two U-shaped rods in the guide mechanism are fixedly arranged on the lower side of the cross beam, a lifting rod in the driving assembly transversely penetrates through the two U-shaped rods and can vertically slide with the two U-shaped rods, and the upper ends of two lifting ropes are fixedly connected with the lower side wall of the lifting rod. The seat plate can be lifted when a user swings the swing, so that the feet of the user are separated from the ground, the user can place the feet at will conveniently, the use comfort is improved, the swing can descend along with swinging of the seat plate after use, the user can jump down from the swing conveniently, and the swing can be used by the user conveniently.
本发明公开了一种装配式绿色建筑钢结构及其安装工艺,涉及到装配式建筑领域,包括两个支架、横梁、两个吊绳和座板,横梁的两端分别与两个支架的上端可拆卸连接,还包括升降机构和导向机构,升降机构包括驱动组件、升降组件和控制组件,导向机构中的两个U形杆均固定设置在横梁的下侧,驱动组件中的吊杆横向穿过两个U形杆并可与两个U形杆上下滑动设置,两个吊绳的上端均与吊杆的下侧壁固定连接。本发明能够在人们使用秋千摆动时将座板进行提升,从而使人们的脚步与地面脱离,便于人们任意放置脚步,提高使用舒适性,且在使用后,能够跟随座板摆动而下降,便于人们从秋千上跳下,便于人们使用。
The invention discloses a fabricated green building steel structure and a mounting process thereof, and relates to the field of fabricated constructions.The fabricated green building steel structure comprises two supports, a cross beam, two lifting ropes and a seat plate, and the two ends of the cross beam are detachably connected with the upper ends of the two supports correspondingly; the lifting mechanism comprises a driving assembly, a lifting assembly and a control assembly, two U-shaped rods in the guide mechanism are fixedly arranged on the lower side of the cross beam, a lifting rod in the driving assembly transversely penetrates through the two U-shaped rods and can vertically slide with the two U-shaped rods, and the upper ends of two lifting ropes are fixedly connected with the lower side wall of the lifting rod. The seat plate can be lifted when a user swings the swing, so that the feet of the user are separated from the ground, the user can place the feet at will conveniently, the use comfort is improved, the swing can descend along with swinging of the seat plate after use, the user can jump down from the swing conveniently, and the swing can be used by the user conveniently.
本发明公开了一种装配式绿色建筑钢结构及其安装工艺,涉及到装配式建筑领域,包括两个支架、横梁、两个吊绳和座板,横梁的两端分别与两个支架的上端可拆卸连接,还包括升降机构和导向机构,升降机构包括驱动组件、升降组件和控制组件,导向机构中的两个U形杆均固定设置在横梁的下侧,驱动组件中的吊杆横向穿过两个U形杆并可与两个U形杆上下滑动设置,两个吊绳的上端均与吊杆的下侧壁固定连接。本发明能够在人们使用秋千摆动时将座板进行提升,从而使人们的脚步与地面脱离,便于人们任意放置脚步,提高使用舒适性,且在使用后,能够跟随座板摆动而下降,便于人们从秋千上跳下,便于人们使用。
Fabricated green building steel structure and mounting process thereof
一种装配式绿色建筑钢结构及其安装工艺
DING HENG (author)
2022-04-29
Patent
Electronic Resource
Chinese
Fabricated steel structure integrated green building and mounting process thereof
European Patent Office | 2020
|Fabricated steel structure integrated green building and designing and mounting process thereof
European Patent Office | 2020
|Fabricated steel-wood building structure and mounting process thereof
European Patent Office | 2023
|Stable fabricated steel structure building and mounting method thereof
European Patent Office | 2022
|Wall surface structure of light steel fabricated building and mounting process thereof
European Patent Office | 2020
|