Construction method of stainless steel water tank cladding forming die
The invention provides a construction method of a stainless steel water tank cladding forming die. The construction method comprises the following steps that a concrete pedestal is preset, and steel bars are fixed to the upper end of the concrete pedestal; a plurality of stainless steel plates and a plurality of pieces of profile steel are welded to form a stainless steel wall plate; then the stainless steel wall plate is hoisted to the position above the concrete pedestal, and the bottom of the stainless steel wall plate is fixedly connected with the upper end of the concrete pedestal; a module unit is mounted; and finally concrete is poured into a gap of the module unit, and a cladding of a stainless steel water tank is manufactured. By the adoption of the scheme, one-time forming of thestainless steel water tank can be guaranteed, secondary construction is avoided, the construction period is shortened, the working efficiency is improved, and pollution generated in the concrete chiseling process of a traditional construction technology is reduced.
本发明提供了一种不锈钢水箱覆面成型模具的施工方法,包括以下步骤:预设混凝土台座,并在混凝土台座上端固定钢筋;将若干不锈钢板和若干型钢拼焊相互拼焊成不锈钢壁板;然后将不锈钢壁板吊装到混凝土台座上方,不锈钢壁板底部和混凝土台座上端固定连接;安装模块单元;最后在模块单元的空隙内浇筑混凝土,制成不锈钢水箱的覆面。采用本方案,能保证不锈钢水箱一次成型,避免二次施工,节省了工期,提高了工作效率,且降低了传统施工工艺混凝土凿毛过程中产生了污染。
Construction method of stainless steel water tank cladding forming die
The invention provides a construction method of a stainless steel water tank cladding forming die. The construction method comprises the following steps that a concrete pedestal is preset, and steel bars are fixed to the upper end of the concrete pedestal; a plurality of stainless steel plates and a plurality of pieces of profile steel are welded to form a stainless steel wall plate; then the stainless steel wall plate is hoisted to the position above the concrete pedestal, and the bottom of the stainless steel wall plate is fixedly connected with the upper end of the concrete pedestal; a module unit is mounted; and finally concrete is poured into a gap of the module unit, and a cladding of a stainless steel water tank is manufactured. By the adoption of the scheme, one-time forming of thestainless steel water tank can be guaranteed, secondary construction is avoided, the construction period is shortened, the working efficiency is improved, and pollution generated in the concrete chiseling process of a traditional construction technology is reduced.
本发明提供了一种不锈钢水箱覆面成型模具的施工方法,包括以下步骤:预设混凝土台座,并在混凝土台座上端固定钢筋;将若干不锈钢板和若干型钢拼焊相互拼焊成不锈钢壁板;然后将不锈钢壁板吊装到混凝土台座上方,不锈钢壁板底部和混凝土台座上端固定连接;安装模块单元;最后在模块单元的空隙内浇筑混凝土,制成不锈钢水箱的覆面。采用本方案,能保证不锈钢水箱一次成型,避免二次施工,节省了工期,提高了工作效率,且降低了传统施工工艺混凝土凿毛过程中产生了污染。
Construction method of stainless steel water tank cladding forming die
一种不锈钢水箱覆面成型模具的施工方法
ZOU SHAOJUN (author) / ZHANG ZIHONG (author) / YANG HONGMEI (author) / WANG HANLING (author) / HONG MEI (author) / YAO PENGFEI (author) / LI QIUYU (author)
2020-12-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste