High-altitude full-transparent steel ring corridor lifting and mounting method
The invention discloses a high-altitude full-transparent steel ring corridor lifting and mounting method. The method comprises the steps that a ring corridor is split into six construction sections, three sections are assembled on a roof erection jig frame platform, beams fall onto a support after assembly is completed, the other three sections are constructed and assembled on a jig frame erectedon a basement top plate, and after construction is completed, overall lifting is conducted, a lifting section glass curtain wall is installed after lifting is completed, and the ring corridor and thecurtain wall are integrally lifted to the designed position. By means of the lifting and mounting method, segmented lifting of the ring corridor is achieved, and the problem of overall lifting safetyin the traditional technology is solved.
本发明公开了一种高空全通透钢环廊提升安装方法,所述环廊提升安装方法包括:将所述环廊拆分为6个施工段,其中三个分段在屋面搭设胎架平台上拼装,拼装完成后落梁至支座上,另外三段在地下室顶板搭设的胎架上施工组装,施工完成后整体提升,并在提升完成后安装提升段玻璃幕墙,环廊加幕墙再整体提升至设计位置。通过本提升安装方法实现了环廊的分段提升,解决了传统技术中整体提升安全性的问题。
High-altitude full-transparent steel ring corridor lifting and mounting method
The invention discloses a high-altitude full-transparent steel ring corridor lifting and mounting method. The method comprises the steps that a ring corridor is split into six construction sections, three sections are assembled on a roof erection jig frame platform, beams fall onto a support after assembly is completed, the other three sections are constructed and assembled on a jig frame erectedon a basement top plate, and after construction is completed, overall lifting is conducted, a lifting section glass curtain wall is installed after lifting is completed, and the ring corridor and thecurtain wall are integrally lifted to the designed position. By means of the lifting and mounting method, segmented lifting of the ring corridor is achieved, and the problem of overall lifting safetyin the traditional technology is solved.
本发明公开了一种高空全通透钢环廊提升安装方法,所述环廊提升安装方法包括:将所述环廊拆分为6个施工段,其中三个分段在屋面搭设胎架平台上拼装,拼装完成后落梁至支座上,另外三段在地下室顶板搭设的胎架上施工组装,施工完成后整体提升,并在提升完成后安装提升段玻璃幕墙,环廊加幕墙再整体提升至设计位置。通过本提升安装方法实现了环廊的分段提升,解决了传统技术中整体提升安全性的问题。
High-altitude full-transparent steel ring corridor lifting and mounting method
一种高空全通透钢环廊提升安装方法
YE SHENGZHI (author) / WANG ZHONGQUAN (author) / GAO JIATAO (author)
2021-01-01
Patent
Electronic Resource
Chinese
Integral lifting method for high-altitude multi-layer multi-channel steel corridor
European Patent Office | 2024
|High-altitude steel structure corridor quick mounting structure for building
European Patent Office | 2022
|Integral lifting method for high-altitude steel corridor with bottom suspended ceiling
European Patent Office | 2024
|High-altitude large-span steel structure corridor and lifting construction method thereof
European Patent Office | 2022
|Construction method for layered lifting and high-altitude splicing of steel structure corridor
European Patent Office | 2024
|