A platform for research: civil engineering, architecture and urbanism
High-altitude steel structure corridor quick mounting structure for building
The invention discloses a high-altitude steel structure corridor quick mounting structure for building, and particularly relates to the field of steel structure corridors, the high-altitude steel structure corridor quick mounting structure comprises a steel structure corridor, a prefabricated water storage tank is fixedly mounted at the top of the steel structure corridor, a rubber sealing plug is inserted into the inner side of the prefabricated water storage tank, and an I-shaped sliding seat is inserted into the rubber sealing plug; the outer side of the I-shaped sliding seat is sleeved with an extension spring, and the bottom of the prefabricated water storage tank is sleeved with a protective cylinder. By arranging a wax strip, the wax strip is melted at a high temperature, a rubber sealing plug is separated from an inner cavity of a prefabricated water storage tank, rainwater in the prefabricated water storage tank flows into an arc-shaped water receiving tank from a first drainage hole, the arc-shaped water receiving tank descends after the weight of the arc-shaped water receiving tank is increased, so that an I-shaped rotating drum is driven to rotate, and glass fiber cloth is spread; and rainwater flows out from the first drainage holes to wet the surface of the glass fiber cloth, so that the fire resistance of the glass fiber cloth is enhanced, and the safety is improved.
本发明公开了一种建筑用高空钢结构连廊快速安装结构,具体涉及钢结构连廊领域,包括钢结构连廊,钢结构连廊的顶部固定安装有预制型储水箱,预制型储水箱的内侧插接有橡胶密封塞,橡胶密封塞的内部插接有工字型滑动座,工字型滑动座的外侧套设有拉伸弹簧,预制型储水箱的底部套接有防护圆筒。本发明通过设置了蜡条,蜡条在受到高温时将融化,橡胶密封塞脱离预制型储水箱的内腔,预制型储水箱内部的雨水从第一排水孔处流至弧形接水箱内,弧形接水箱的重量加重后将下降,从而带动工字型转筒转动,使得玻璃纤维布铺展,且通过雨水从第一排水孔处流出淋湿玻璃纤维布表面,从而加强玻璃纤维布的防火性,因此提升了安全性。
High-altitude steel structure corridor quick mounting structure for building
The invention discloses a high-altitude steel structure corridor quick mounting structure for building, and particularly relates to the field of steel structure corridors, the high-altitude steel structure corridor quick mounting structure comprises a steel structure corridor, a prefabricated water storage tank is fixedly mounted at the top of the steel structure corridor, a rubber sealing plug is inserted into the inner side of the prefabricated water storage tank, and an I-shaped sliding seat is inserted into the rubber sealing plug; the outer side of the I-shaped sliding seat is sleeved with an extension spring, and the bottom of the prefabricated water storage tank is sleeved with a protective cylinder. By arranging a wax strip, the wax strip is melted at a high temperature, a rubber sealing plug is separated from an inner cavity of a prefabricated water storage tank, rainwater in the prefabricated water storage tank flows into an arc-shaped water receiving tank from a first drainage hole, the arc-shaped water receiving tank descends after the weight of the arc-shaped water receiving tank is increased, so that an I-shaped rotating drum is driven to rotate, and glass fiber cloth is spread; and rainwater flows out from the first drainage holes to wet the surface of the glass fiber cloth, so that the fire resistance of the glass fiber cloth is enhanced, and the safety is improved.
本发明公开了一种建筑用高空钢结构连廊快速安装结构,具体涉及钢结构连廊领域,包括钢结构连廊,钢结构连廊的顶部固定安装有预制型储水箱,预制型储水箱的内侧插接有橡胶密封塞,橡胶密封塞的内部插接有工字型滑动座,工字型滑动座的外侧套设有拉伸弹簧,预制型储水箱的底部套接有防护圆筒。本发明通过设置了蜡条,蜡条在受到高温时将融化,橡胶密封塞脱离预制型储水箱的内腔,预制型储水箱内部的雨水从第一排水孔处流至弧形接水箱内,弧形接水箱的重量加重后将下降,从而带动工字型转筒转动,使得玻璃纤维布铺展,且通过雨水从第一排水孔处流出淋湿玻璃纤维布表面,从而加强玻璃纤维布的防火性,因此提升了安全性。
High-altitude steel structure corridor quick mounting structure for building
一种建筑用高空钢结构连廊快速安装结构
JIANG XINXIN (author) / YIN HAILONG (author) / YU ZHAOBO (author) / TIAN SHUYU (author) / LU LINGLING (author)
2022-07-26
Patent
Electronic Resource
Chinese
High-altitude steel structure corridor splicing structure
European Patent Office | 2024
|High-altitude full-transparent steel ring corridor lifting and mounting method
European Patent Office | 2021
|Mounting structure and mounting method for steel structure passage corridor
European Patent Office | 2020
|Reverse construction method for high-altitude cantilever steel structure corridor
European Patent Office | 2024
|