Construction method for newly-built channel
The invention discloses a construction method for a newly-built channel. The construction method comprises the following steps that surface cleaning is conducted; cement mixing pile construction is conducted; plastic steel plate pile construction is conducted; a row of first-level well point pipe dewatering is arranged on each of the two sides of the channel and the center line of the channel; channel earthwork and revetment foundation pit excavation is conducted; excavation is conducted till the bottom elevation of the channel is + 1.6m; two rows of second-level well point pipe dewatering arearranged in the middle of the channel, and first-level well point pipes on the center line of the channel are dismounted; earthwork excavation is conducted in a revetment foundation pit and the channel; earthwork excavation is conducted in the channel till the elevation is -2.6m; after a wall body of a retaining wall and backfill soil behind the wall body of the retaining wall are + 1.6m, water is drained in front of the wall till the elevation is 0.6m, and second-level well point pipe dewatering is stopped; construction of the wall body of the retaining wall is conducted and backfill soil behind the wall body of the retaining wall is constructed to be + 3.2m, and first-level well point pipe dewatering on the two sides of the channel is stopped; after a revetment and a bridge are completed, water is drained in the section of the channel; a dredger is used for excavating earthwork used for arranging the first-level well point pipes and the second-level well point pipes; and ecologicalbag surface protection construction is conducted. According to the construction method, overwater operation is not needed, construction is safe, and cost is saved.
本发明公开了一种新建航道的施工方法,清表→水泥搅拌桩施工→塑钢板桩施工→在航道两侧和航道中心线各自布设一排一级井点管降水→航道土方、护岸基坑开挖→挖至航道的底标高+1.6m→在航道中部布设两排二级井点管降水,并拆除航道中心线上的一级井点管→护岸基坑、航道内土方开挖→航道内土方开挖至标高‑2.6m→待挡土墙墙身及后方回填土至标高+1.6m后,墙前放水至标高0.6m,停止二级井点管降水→挡土墙墙身施工及后方回填土至标高+3.2m,停止航道两侧的一级井点管降水→护岸、桥梁完工后,航道断面内放水→挖泥船挖除用于布设一级、二级井点管的土方→生态袋护面施工。本发明的施工方法无水上作业,施工安全,节省成本。
Construction method for newly-built channel
The invention discloses a construction method for a newly-built channel. The construction method comprises the following steps that surface cleaning is conducted; cement mixing pile construction is conducted; plastic steel plate pile construction is conducted; a row of first-level well point pipe dewatering is arranged on each of the two sides of the channel and the center line of the channel; channel earthwork and revetment foundation pit excavation is conducted; excavation is conducted till the bottom elevation of the channel is + 1.6m; two rows of second-level well point pipe dewatering arearranged in the middle of the channel, and first-level well point pipes on the center line of the channel are dismounted; earthwork excavation is conducted in a revetment foundation pit and the channel; earthwork excavation is conducted in the channel till the elevation is -2.6m; after a wall body of a retaining wall and backfill soil behind the wall body of the retaining wall are + 1.6m, water is drained in front of the wall till the elevation is 0.6m, and second-level well point pipe dewatering is stopped; construction of the wall body of the retaining wall is conducted and backfill soil behind the wall body of the retaining wall is constructed to be + 3.2m, and first-level well point pipe dewatering on the two sides of the channel is stopped; after a revetment and a bridge are completed, water is drained in the section of the channel; a dredger is used for excavating earthwork used for arranging the first-level well point pipes and the second-level well point pipes; and ecologicalbag surface protection construction is conducted. According to the construction method, overwater operation is not needed, construction is safe, and cost is saved.
本发明公开了一种新建航道的施工方法,清表→水泥搅拌桩施工→塑钢板桩施工→在航道两侧和航道中心线各自布设一排一级井点管降水→航道土方、护岸基坑开挖→挖至航道的底标高+1.6m→在航道中部布设两排二级井点管降水,并拆除航道中心线上的一级井点管→护岸基坑、航道内土方开挖→航道内土方开挖至标高‑2.6m→待挡土墙墙身及后方回填土至标高+1.6m后,墙前放水至标高0.6m,停止二级井点管降水→挡土墙墙身施工及后方回填土至标高+3.2m,停止航道两侧的一级井点管降水→护岸、桥梁完工后,航道断面内放水→挖泥船挖除用于布设一级、二级井点管的土方→生态袋护面施工。本发明的施工方法无水上作业,施工安全,节省成本。
Construction method for newly-built channel
一种新建航道的施工方法
WU SONGHUA (author) / HU SHAOWU (author) / LAI ZEHUA (author) / YAN XIAOYU (author) / YANG LEI (author) / LI WEIJUN (author) / PAN FENG (author) / PENG JUNTANG (author) / SU WENYONG (author) / LIU GUANGZE (author)
2021-01-05
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction method of newly-built river channel anti-seepage air closing structure
European Patent Office | 2024
|European Patent Office | 2024
|Construction method for newly-built line crossing existing pipeline
European Patent Office | 2021
|Construction method of driven pile for newly built structure
European Patent Office | 2021
|European Patent Office | 2024
|