A platform for research: civil engineering, architecture and urbanism
Steel skeleton structure and welding process thereof
The invention discloses a steel skeleton structure and a welding process thereof. The steel skeleton structure comprises a plurality of stand columns, transverse columns, beam frames and beam columns;the two ends of each transverse column are attached to the outer side walls of the corresponding stand columns, first mounting blocks are integrally arranged at the two ends of each transverse column, a first mounting groove allowing the corresponding first mounting block to be inserted is formed in the top end of each stand column, sliding grooves are symmetrically formed in the end wall of eachbeam frame in a penetrating mode and located in the center of the beam frame, a positioning rod is arranged in each sliding groove in a sliding mode, a positioning groove allowing the corresponding positioning rod to be inserted is formed in the top wall of each stand column and located in the center of the stand column, and a first limiting groove allowing the corresponding beam column to be inserted is formed in the top wall of each beam frame in the height direction of the beam frame. The steel skeleton structure and the welding process thereof have the beneficial effects that constructorscan conveniently conduct butt joint on frameworks, the welding convenience is improved, the construction efficiency is improved, and the construction period is shortened.
本申请涉及一种钢骨架结构及其焊接工艺,其包括若干个立柱、横柱、梁架和梁柱,所述横柱的两端与立柱的外侧壁相互贴合,所述横柱的两端一体设置有第一安装块,所述立柱的顶端开设有供第一安装块插设的第一安装槽,所述梁架的端壁上且位于其中心处对称贯穿设置有滑移槽,所述滑移槽内滑移设置有定位杆,所述立柱的顶壁且位于其中心处开设有供定位杆插设的定位槽,所述梁架的顶壁上沿其高度方向开设有供梁柱插设的第一限位槽;本申请具有便于施工人员将骨架之间对接,提高焊接的便捷性,提高施工效率,缩短施工周期的优势的效果。
Steel skeleton structure and welding process thereof
The invention discloses a steel skeleton structure and a welding process thereof. The steel skeleton structure comprises a plurality of stand columns, transverse columns, beam frames and beam columns;the two ends of each transverse column are attached to the outer side walls of the corresponding stand columns, first mounting blocks are integrally arranged at the two ends of each transverse column, a first mounting groove allowing the corresponding first mounting block to be inserted is formed in the top end of each stand column, sliding grooves are symmetrically formed in the end wall of eachbeam frame in a penetrating mode and located in the center of the beam frame, a positioning rod is arranged in each sliding groove in a sliding mode, a positioning groove allowing the corresponding positioning rod to be inserted is formed in the top wall of each stand column and located in the center of the stand column, and a first limiting groove allowing the corresponding beam column to be inserted is formed in the top wall of each beam frame in the height direction of the beam frame. The steel skeleton structure and the welding process thereof have the beneficial effects that constructorscan conveniently conduct butt joint on frameworks, the welding convenience is improved, the construction efficiency is improved, and the construction period is shortened.
本申请涉及一种钢骨架结构及其焊接工艺,其包括若干个立柱、横柱、梁架和梁柱,所述横柱的两端与立柱的外侧壁相互贴合,所述横柱的两端一体设置有第一安装块,所述立柱的顶端开设有供第一安装块插设的第一安装槽,所述梁架的端壁上且位于其中心处对称贯穿设置有滑移槽,所述滑移槽内滑移设置有定位杆,所述立柱的顶壁且位于其中心处开设有供定位杆插设的定位槽,所述梁架的顶壁上沿其高度方向开设有供梁柱插设的第一限位槽;本申请具有便于施工人员将骨架之间对接,提高焊接的便捷性,提高施工效率,缩短施工周期的优势的效果。
Steel skeleton structure and welding process thereof
一种钢骨架结构及其焊接工艺
ZHENG QINGQING (author) / HE QI (author) / JIN XIN (author) / FANG QIONGQIAN (author) / FENG YINGYING (author)
2021-01-05
Patent
Electronic Resource
Chinese
STEEL FRAMEWORK SKELETON STRUCTURE AND DESIGN METHOD THEREOF
European Patent Office | 2023
|STEEL PLATE UNIT, PRECAST SKELETON, SKELETON CONSTRUCTION METHOD, AND SKELETON STRUCTURE
European Patent Office | 2015
|Engineering Index Backfile | 1896
Steel structure square pipe column welding structure and welding process
European Patent Office | 2024
|