CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
A manager terminal: generates, on the basis of details input by a construction manager, work plan information relating to a plan for work of one or more work machines, the work plan information beingset for each operator remotely operating the one or more work machines, and the work plan information including work details for the work machine remotely operated by the operator, and work time corresponding to the work details; and inputs the work plan information to a server. The server: generates, on the basis of the work plan information input from the manager terminal and work information input from at least one work information acquisition unit, progress information indicating the progress of the work of the operator for each of the one or more work machines; inputs the progress information to the manager terminal; and presents the progress information to the construction manager.
管理者终端生成包含作业内容和对于对该作业内容的作业时间的作业计划信息,并将其输入到服务器,其中,所述作业内容是基于施工管理者输入的内容而生成的与通过至少一台工程机械进行作业的计划有关的信息,是针对每个远程操作至少一台工程机械的操作人员而设定的、由该操作人员远程操作的工程机械进行的作业内容。服务器,基于从管理者终端输入的作业计划信息和从至少一个作业信息获取部输入的作业信息,针对至少一台工程机械中的每台工程机械生成表示操作人员的作业的进度的进度信息,并将该进度信息输入到管理者终端,向施工管理者提示进度信息。
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
A manager terminal: generates, on the basis of details input by a construction manager, work plan information relating to a plan for work of one or more work machines, the work plan information beingset for each operator remotely operating the one or more work machines, and the work plan information including work details for the work machine remotely operated by the operator, and work time corresponding to the work details; and inputs the work plan information to a server. The server: generates, on the basis of the work plan information input from the manager terminal and work information input from at least one work information acquisition unit, progress information indicating the progress of the work of the operator for each of the one or more work machines; inputs the progress information to the manager terminal; and presents the progress information to the construction manager.
管理者终端生成包含作业内容和对于对该作业内容的作业时间的作业计划信息,并将其输入到服务器,其中,所述作业内容是基于施工管理者输入的内容而生成的与通过至少一台工程机械进行作业的计划有关的信息,是针对每个远程操作至少一台工程机械的操作人员而设定的、由该操作人员远程操作的工程机械进行的作业内容。服务器,基于从管理者终端输入的作业计划信息和从至少一个作业信息获取部输入的作业信息,针对至少一台工程机械中的每台工程机械生成表示操作人员的作业的进度的进度信息,并将该进度信息输入到管理者终端,向施工管理者提示进度信息。
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
施工管理系统以及施工管理方法
SAIKI SEIJI (author) / YAMAZAKI YOICHIRO (author)
2021-01-08
Patent
Electronic Resource
Chinese
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02F
Baggern
,
DREDGING
/
E04G
SCAFFOLDING
,
Baugerüste
/
G05B
Steuer- oder Regelsysteme allgemein
,
CONTROL OR REGULATING SYSTEMS IN GENERAL
CONSTRUCTION MANAGEMENT DEVICE, CONSTRUCTION MANAGEMENT SYSTEM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2021
|CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2015
|CONSTRUCTION MANAGEMENT DEVICE, CONSTRUCTION MANAGEMENT SYSTEM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2018
|CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2024
|CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2021
|