A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
To provide a construction management system and a construction management method capable of quantitatively judging a construction quality in a scattering process.SOLUTION: A construction management system 1 managing a construction in a scattering process comprises: a capturing unit 12 capturing a scattered materials for each area; and a processing unit 20 obtaining information regarding construction quality control by analyzing the captured images. The processing unit 20 includes: a constituent detection portion detecting constituents of the material in the captured image; and a particle size distribution estimation portion estimating a particle size distribution of the material from the detected constituents. The construction management system 1 further comprises a moving portion 10 capable of mounting the capturing unit 12. The capturing unit 12 may capture the material while moving on the scattered surface.SELECTED DRAWING: Figure 1
【課題】撒き出し工程の施工の品質を定量的に判断することができる施工管理システムおよび施工管理方法を提供する。【解決手段】撒き出し工程の施工を管理する施工管理システム1であって、撒き出された材料をエリアごとに撮影する撮影部12と、撮影画像を解析することによって、施工の品質管理に関する情報を求める処理部20と、を備える。処理部20は、前記撮影画像において材料の構成物を検出する構成物検出部と、検出された前記構成物から前記材料の粒度分布を推定する粒度分布推定部とを有する。施工管理システム1は、撮影部12を搭載可能な移動部10をさらに備え、撮影部12は、撒き出し面上を移動しながら前記材料を撮影してもよい。【選択図】図1
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
To provide a construction management system and a construction management method capable of quantitatively judging a construction quality in a scattering process.SOLUTION: A construction management system 1 managing a construction in a scattering process comprises: a capturing unit 12 capturing a scattered materials for each area; and a processing unit 20 obtaining information regarding construction quality control by analyzing the captured images. The processing unit 20 includes: a constituent detection portion detecting constituents of the material in the captured image; and a particle size distribution estimation portion estimating a particle size distribution of the material from the detected constituents. The construction management system 1 further comprises a moving portion 10 capable of mounting the capturing unit 12. The capturing unit 12 may capture the material while moving on the scattered surface.SELECTED DRAWING: Figure 1
【課題】撒き出し工程の施工の品質を定量的に判断することができる施工管理システムおよび施工管理方法を提供する。【解決手段】撒き出し工程の施工を管理する施工管理システム1であって、撒き出された材料をエリアごとに撮影する撮影部12と、撮影画像を解析することによって、施工の品質管理に関する情報を求める処理部20と、を備える。処理部20は、前記撮影画像において材料の構成物を検出する構成物検出部と、検出された前記構成物から前記材料の粒度分布を推定する粒度分布推定部とを有する。施工管理システム1は、撮影部12を搭載可能な移動部10をさらに備え、撮影部12は、撒き出し面上を移動しながら前記材料を撮影してもよい。【選択図】図1
CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
施工管理システムおよび施工管理方法
ISHII TAKAYUKI (author) / NOMURA KAI (author)
2024-02-01
Patent
Electronic Resource
Japanese
CONSTRUCTION MANAGEMENT DEVICE, CONSTRUCTION MANAGEMENT SYSTEM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2021
|CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2015
|CONSTRUCTION MANAGEMENT DEVICE, CONSTRUCTION MANAGEMENT SYSTEM, AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2018
|CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2021
|CONSTRUCTION MANAGEMENT SYSTEM AND CONSTRUCTION MANAGEMENT METHOD
European Patent Office | 2021
|