Novel sloping field constructional engineering pile construction method
The invention discloses a novel sloping field constructional engineering pile construction method. The method comprises the steps that the specific position of an original punched cast-in-place pile is explored through ultrasonic waves, and a pile head of the original punched cast-in-place pile is excavated through a small excavator or manual earth excavation; after the pile head of the original punched cast-in-place pile is excavated, concrete of the pile head of the original punched cast-in-place pile is broken and chiseled through a cannon machine, the center of the pile head of the original punched cast-in-place pile is chiseled away, a groove is chiseled out, and the groove is 300 mm in length, 300 mm in width and 300 mm in depth; butt joint pile main reinforcements and original punched cast-in-place pile main reinforcements are in lap joint in a double-face welding manner, welding slag is removed in time after welding, then the butt joint pile main reinforcements are hooped, andthe diameter and the distance of stirrups of the butt joint pile main reinforcements are the same as those of the original punched cast-in-place pile main reinforcements; and by the adoption of the novel sloping field constructional engineering pile construction method, ground operation can be achieved in engineering pile splicing construction, pile splicing construction is convenient and rapid through ground operation, the quality level is improved, safety risks are reduced, meanwhile, the stress area of a pile foundation is increased, the stress performance of the pile foundation is improved, and the service life is prolonged.
本发明公开了新型坡地建筑工程桩施工方法,通过超声波勘探出原冲孔灌注桩的具体位置,并通过小型挖掘机或人工挖土挖出原冲孔灌注桩桩头;开挖出原冲孔灌注桩桩头后采用炮机破凿原冲孔灌注桩桩头的混凝土,将原冲孔灌注桩桩头的中心进行凿除,凿出凹槽,所述凹槽的长宽为300mm,深300mm;使用双面焊接的方式对接桩主筋与原冲孔灌注桩主筋进行搭接,焊接后及时清除焊渣,再对接桩主筋进行箍筋,接桩主筋箍筋的直径及间距与原冲孔灌注桩主筋相同;使用新型坡地建筑工程桩施工方法,使工程桩接桩施工能够实现地面化操作,地面化操作使得接桩施工方便快捷,提高质量水平、降低安全风险,同时增加了桩基础的受力面积提高其受力性能,并且提高使用寿命。
Novel sloping field constructional engineering pile construction method
The invention discloses a novel sloping field constructional engineering pile construction method. The method comprises the steps that the specific position of an original punched cast-in-place pile is explored through ultrasonic waves, and a pile head of the original punched cast-in-place pile is excavated through a small excavator or manual earth excavation; after the pile head of the original punched cast-in-place pile is excavated, concrete of the pile head of the original punched cast-in-place pile is broken and chiseled through a cannon machine, the center of the pile head of the original punched cast-in-place pile is chiseled away, a groove is chiseled out, and the groove is 300 mm in length, 300 mm in width and 300 mm in depth; butt joint pile main reinforcements and original punched cast-in-place pile main reinforcements are in lap joint in a double-face welding manner, welding slag is removed in time after welding, then the butt joint pile main reinforcements are hooped, andthe diameter and the distance of stirrups of the butt joint pile main reinforcements are the same as those of the original punched cast-in-place pile main reinforcements; and by the adoption of the novel sloping field constructional engineering pile construction method, ground operation can be achieved in engineering pile splicing construction, pile splicing construction is convenient and rapid through ground operation, the quality level is improved, safety risks are reduced, meanwhile, the stress area of a pile foundation is increased, the stress performance of the pile foundation is improved, and the service life is prolonged.
本发明公开了新型坡地建筑工程桩施工方法,通过超声波勘探出原冲孔灌注桩的具体位置,并通过小型挖掘机或人工挖土挖出原冲孔灌注桩桩头;开挖出原冲孔灌注桩桩头后采用炮机破凿原冲孔灌注桩桩头的混凝土,将原冲孔灌注桩桩头的中心进行凿除,凿出凹槽,所述凹槽的长宽为300mm,深300mm;使用双面焊接的方式对接桩主筋与原冲孔灌注桩主筋进行搭接,焊接后及时清除焊渣,再对接桩主筋进行箍筋,接桩主筋箍筋的直径及间距与原冲孔灌注桩主筋相同;使用新型坡地建筑工程桩施工方法,使工程桩接桩施工能够实现地面化操作,地面化操作使得接桩施工方便快捷,提高质量水平、降低安全风险,同时增加了桩基础的受力面积提高其受力性能,并且提高使用寿命。
Novel sloping field constructional engineering pile construction method
新型坡地建筑工程桩施工方法
LI TIAN (author) / YIN TUJUN (author) / KE CANRONG (author) / OUYANG JINLE (author) / WU JUNJI (author) / FANG ZHIHONG (author) / YU CHENGPENG (author)
2021-01-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile foundation pore-forming construction method for constructional engineering
European Patent Office | 2023
|Constructional engineering foundation pile detection method
European Patent Office | 2021
|