The invention discloses a steel structure frame type tower crane foundation. The steel structure frame type tower crane foundation comprises a main body, a fixing mechanism and a storage mechanism, the main body comprises a main concrete foundation unit, and the outer wall of the main concrete foundation unit is connected with a transition concrete foundation unit. By arranging fixing plates and connecting rods, the transition concrete foundation unit is attached to the main concrete foundation unit along the position between every two parallel and adjacent fixing plates, an end concrete foundation unit is arranged at one end of the transition concrete foundation unit, the connecting rods sequentially penetrate through the end concrete foundation units, the transition concrete foundation unit and connecting grooves in the fixing plates, buckles are attached to the inner walls of the connecting rods to fix the connecting rods, thus pre-fixing of the tower crane foundation is completed,primary pre-fixing can be conveniently conducted when the tower crane foundation is fixedly connected, and the influence on the connection due to the position deviation of the foundation units is avoided.
本发明公开了一种钢结构框架式塔机基础,包括主体、固定机构和收纳机构,所述主体包括有主混凝土基础单元,所述主混凝土基础单元的外壁连接有过渡混凝土基础单元。本发明通过设置固定板和连接杆,将过渡混凝土基础单元沿着平行且相邻的两块固定板之间与主混凝土基础单元贴合,端部混凝土基础单元置于过渡混凝土基础单元的一端,将连接杆依次穿过端部混凝土基础单元、过渡混凝土基础单元和固定板内的连接槽,通过卡扣与连接杆的内壁贴合对连接杆进行固定,从而完成对塔机基础的预固定,便于在对塔机基础进行固定连接时进行一次预固定,避免了因基础单元的位置偏差对连接造成影响。
The invention discloses a steel structure frame type tower crane foundation. The steel structure frame type tower crane foundation comprises a main body, a fixing mechanism and a storage mechanism, the main body comprises a main concrete foundation unit, and the outer wall of the main concrete foundation unit is connected with a transition concrete foundation unit. By arranging fixing plates and connecting rods, the transition concrete foundation unit is attached to the main concrete foundation unit along the position between every two parallel and adjacent fixing plates, an end concrete foundation unit is arranged at one end of the transition concrete foundation unit, the connecting rods sequentially penetrate through the end concrete foundation units, the transition concrete foundation unit and connecting grooves in the fixing plates, buckles are attached to the inner walls of the connecting rods to fix the connecting rods, thus pre-fixing of the tower crane foundation is completed,primary pre-fixing can be conveniently conducted when the tower crane foundation is fixedly connected, and the influence on the connection due to the position deviation of the foundation units is avoided.
本发明公开了一种钢结构框架式塔机基础,包括主体、固定机构和收纳机构,所述主体包括有主混凝土基础单元,所述主混凝土基础单元的外壁连接有过渡混凝土基础单元。本发明通过设置固定板和连接杆,将过渡混凝土基础单元沿着平行且相邻的两块固定板之间与主混凝土基础单元贴合,端部混凝土基础单元置于过渡混凝土基础单元的一端,将连接杆依次穿过端部混凝土基础单元、过渡混凝土基础单元和固定板内的连接槽,通过卡扣与连接杆的内壁贴合对连接杆进行固定,从而完成对塔机基础的预固定,便于在对塔机基础进行固定连接时进行一次预固定,避免了因基础单元的位置偏差对连接造成影响。
Steel structure frame type tower crane foundation
一种钢结构框架式塔机基础