A platform for research: civil engineering, architecture and urbanism
The invention provides a pier column concrete curing covering material winding device and method. The device comprises a vertical rod, a first bevel gear, a connecting sleeve and a horizontal cross rod, wherein the vertical rod is used for being coaxially connected to concrete at the top of a pier column, the first bevel gear which is coaxially fixed on the vertical rod, the connecting sleeve is coaxial with the vertical rod and connected to the upper end of the vertical rod through a first bearing, the connecting sleeve is connected with the horizontal cross rod through a second bearing withthe horizontal axis, one end of the horizontal cross rod is coaxially connected with a rope winding disc with the horizontal axis, the other end of the horizontal cross rod is coaxially connected witha second bevel gear, the axis of the second bevel gear is horizontal, the second bevel gear is meshed with the first bevel gear, a lifting rope is wound on the rope winding disc, the lower end of thelifting rope is connected to the rotatable center of a horizontal tray, and the horizontal tray is used for mounting a maintenance covering material surrounding the lifting rope. According to the device, winding and recycling construction of the maintenance covering material can be rapidly conducted, the construction efficiency is improved, the construction cost is reduced, environmental pollution is reduced, and environmental protection is facilitated.
本发明提供一种墩柱砼养护覆盖材料缠绕装置及缠绕方法,装置包括:竖立的立杆,用于同轴连接在墩柱顶部的砼上;第一伞齿轮,同轴固定在立杆上;连接套,与立杆同轴且通过第一轴承连接在立杆上端,在连接套上通过轴线水平的第二轴承与水平横杆连接;水平横杆,水平横杆的一端与轴线水平的卷绳盘同轴连接,水平横杆的另一端同轴连接有第二伞齿轮,第二伞齿轮的轴线水平,且第二伞齿轮与第一伞齿轮啮合,在卷绳盘上盘绕有吊绳,吊绳的下端连接在水平托盘的可转动的中心,水平托盘用于安装围绕所述吊绳的养护覆盖材料。本发明可以快速进行养护覆盖材料的缠绕及收回施工,提高施工效率,降低施工成本,减少环境污染,以利环保。
The invention provides a pier column concrete curing covering material winding device and method. The device comprises a vertical rod, a first bevel gear, a connecting sleeve and a horizontal cross rod, wherein the vertical rod is used for being coaxially connected to concrete at the top of a pier column, the first bevel gear which is coaxially fixed on the vertical rod, the connecting sleeve is coaxial with the vertical rod and connected to the upper end of the vertical rod through a first bearing, the connecting sleeve is connected with the horizontal cross rod through a second bearing withthe horizontal axis, one end of the horizontal cross rod is coaxially connected with a rope winding disc with the horizontal axis, the other end of the horizontal cross rod is coaxially connected witha second bevel gear, the axis of the second bevel gear is horizontal, the second bevel gear is meshed with the first bevel gear, a lifting rope is wound on the rope winding disc, the lower end of thelifting rope is connected to the rotatable center of a horizontal tray, and the horizontal tray is used for mounting a maintenance covering material surrounding the lifting rope. According to the device, winding and recycling construction of the maintenance covering material can be rapidly conducted, the construction efficiency is improved, the construction cost is reduced, environmental pollution is reduced, and environmental protection is facilitated.
本发明提供一种墩柱砼养护覆盖材料缠绕装置及缠绕方法,装置包括:竖立的立杆,用于同轴连接在墩柱顶部的砼上;第一伞齿轮,同轴固定在立杆上;连接套,与立杆同轴且通过第一轴承连接在立杆上端,在连接套上通过轴线水平的第二轴承与水平横杆连接;水平横杆,水平横杆的一端与轴线水平的卷绳盘同轴连接,水平横杆的另一端同轴连接有第二伞齿轮,第二伞齿轮的轴线水平,且第二伞齿轮与第一伞齿轮啮合,在卷绳盘上盘绕有吊绳,吊绳的下端连接在水平托盘的可转动的中心,水平托盘用于安装围绕所述吊绳的养护覆盖材料。本发明可以快速进行养护覆盖材料的缠绕及收回施工,提高施工效率,降低施工成本,减少环境污染,以利环保。
Pier column concrete curing covering material winding device and method
一种墩柱砼养护材料覆盖缠绕装置及缠绕方法
LIU SIMOU (author)
2021-01-15
Patent
Electronic Resource
Chinese
Bridge pier column concrete curing device and curing method
European Patent Office | 2022
|Concrete pier column film covering device and film covering method
European Patent Office | 2024
|