A platform for research: civil engineering, architecture and urbanism
Shear wall steel angle stand column module for fabricated building
The invention discloses a shear wall steel angle stand column module for a fabricated building, the shear wall steel angle stand column module comprises a shell, a column body penetrates through one side of the interior of the shell, two fifth clamping grooves are formed in one side of the column body, a first fixing block is welded to one side of the interior of the shell, a fourth clamping groove is formed in one side of the interior of the first fixing block, a second fixing block is clamped inside the fourth clamping groove, one side of the second fixing block is welded to the column body,and fourth clamping blocks are clamped inside the fifth clamping grooves. In the using process of the device, the column body is inserted into the shell, the second fixing block is connected with thefirst fixing block in a clamped mode, second bolts are rotated to drive second fixing plates to move, the second fixing plates drive the fourth clamping blocks to be clamped into the fifth clamping grooves, third clamping blocks penetrate through one sides of insertion grooves to be clamped into the second fixing block, and the column body and the shell are fixed, so that the device can quickly finish the mounting operation of the column body.
本发明公开了一种装配式建筑用剪力墙角钢立柱模块,包括壳体,所述壳体的内部一侧贯穿有柱体,所述柱体的一侧开设有两个第五卡槽,所述壳体的内部一侧焊接有第一固定块,所述第一固定块的内部一侧开设有第四卡槽,所述第四卡槽的内部卡接有第二固定块,所述第二固定块的一侧与柱体焊接,所述第五卡槽的内部卡接有第四卡块;本装置在使用过程中,通过将柱体插入壳体中,使第二固定块与第一固定块卡接,转动第二螺栓,使其带动第二固定板运动,第二固定板带动第四卡块卡入第五卡槽中,并使第三卡块穿过插槽的一侧卡入第二固定块中,将柱体与壳体固定,使本装置可以快速完成对柱体的安装操作。
Shear wall steel angle stand column module for fabricated building
The invention discloses a shear wall steel angle stand column module for a fabricated building, the shear wall steel angle stand column module comprises a shell, a column body penetrates through one side of the interior of the shell, two fifth clamping grooves are formed in one side of the column body, a first fixing block is welded to one side of the interior of the shell, a fourth clamping groove is formed in one side of the interior of the first fixing block, a second fixing block is clamped inside the fourth clamping groove, one side of the second fixing block is welded to the column body,and fourth clamping blocks are clamped inside the fifth clamping grooves. In the using process of the device, the column body is inserted into the shell, the second fixing block is connected with thefirst fixing block in a clamped mode, second bolts are rotated to drive second fixing plates to move, the second fixing plates drive the fourth clamping blocks to be clamped into the fifth clamping grooves, third clamping blocks penetrate through one sides of insertion grooves to be clamped into the second fixing block, and the column body and the shell are fixed, so that the device can quickly finish the mounting operation of the column body.
本发明公开了一种装配式建筑用剪力墙角钢立柱模块,包括壳体,所述壳体的内部一侧贯穿有柱体,所述柱体的一侧开设有两个第五卡槽,所述壳体的内部一侧焊接有第一固定块,所述第一固定块的内部一侧开设有第四卡槽,所述第四卡槽的内部卡接有第二固定块,所述第二固定块的一侧与柱体焊接,所述第五卡槽的内部卡接有第四卡块;本装置在使用过程中,通过将柱体插入壳体中,使第二固定块与第一固定块卡接,转动第二螺栓,使其带动第二固定板运动,第二固定板带动第四卡块卡入第五卡槽中,并使第三卡块穿过插槽的一侧卡入第二固定块中,将柱体与壳体固定,使本装置可以快速完成对柱体的安装操作。
Shear wall steel angle stand column module for fabricated building
一种装配式建筑用剪力墙角钢立柱模块
ZHOU CHEN (author) / XIN JIANTAO (author) / CHEN XIAOXIAO (author) / XU YIWEI (author) / CHEN YUXUAN (author) / WANG PEIHAN (author) / WANG SHUANGWEN (author) / HU YUE (author)
2021-01-22
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2024
|Stand column module of fabricated building and using method of stand column module
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2025
|