A platform for research: civil engineering, architecture and urbanism
Steel guide wall for underground continuous wall and construction method of steel guide wall
The invention relates to the technical field of underground continuous wall construction, in particular to a steel guide wall for an underground continuous wall and a construction method of the steelguide wall. The steel guide wall comprises a guide wall groove formed in the ground; the two side walls of the guide wall groove are each provided with a steel guide wall body; each steel guide wall body comprises a vertical plate and a transverse plate; the vertical plates abut against the side walls of the guide wall groove; the transverse plates are fixed to the top ends of the side walls of the guide wall groove and fixedly connected with the vertical plates; inserting rods are arranged between the vertical plates and the side walls of the guide wall groove; one ends of the inserting rodsare fixedly connected with the vertical plates, and the other ends of the inserting rods are matched with the side walls of the guide wall groove in an inserted mode; a hydraulic cylinder is arrangedbetween the two vertical plates; and the two ends of the hydraulic cylinder are detachably and fixedly connected with the two vertical plates. The steel guide wall has the effect of shortening the guide wall construction period.
本申请涉及地下连续墙施工的技术领域,尤其是涉及一种地下连续墙用的钢导墙及其施工方法,其包括开设在地面上的导墙槽,所述导墙槽的两个侧壁均设置有钢导墙,钢导墙包括竖板和横板,竖板与导墙槽的侧壁抵接,横板与导墙槽侧壁的顶端固定,横板和竖板固定连接,竖板与导墙槽的侧壁之间设置有插入杆,插入杆的一端与竖板固定连接,另一端与导墙槽的侧壁插接配合,两个竖板之间设置有液压缸,液压缸的两端与两个竖板之间均可拆卸固定连接。本申请具有缩短导墙施工周期的效果。
Steel guide wall for underground continuous wall and construction method of steel guide wall
The invention relates to the technical field of underground continuous wall construction, in particular to a steel guide wall for an underground continuous wall and a construction method of the steelguide wall. The steel guide wall comprises a guide wall groove formed in the ground; the two side walls of the guide wall groove are each provided with a steel guide wall body; each steel guide wall body comprises a vertical plate and a transverse plate; the vertical plates abut against the side walls of the guide wall groove; the transverse plates are fixed to the top ends of the side walls of the guide wall groove and fixedly connected with the vertical plates; inserting rods are arranged between the vertical plates and the side walls of the guide wall groove; one ends of the inserting rodsare fixedly connected with the vertical plates, and the other ends of the inserting rods are matched with the side walls of the guide wall groove in an inserted mode; a hydraulic cylinder is arrangedbetween the two vertical plates; and the two ends of the hydraulic cylinder are detachably and fixedly connected with the two vertical plates. The steel guide wall has the effect of shortening the guide wall construction period.
本申请涉及地下连续墙施工的技术领域,尤其是涉及一种地下连续墙用的钢导墙及其施工方法,其包括开设在地面上的导墙槽,所述导墙槽的两个侧壁均设置有钢导墙,钢导墙包括竖板和横板,竖板与导墙槽的侧壁抵接,横板与导墙槽侧壁的顶端固定,横板和竖板固定连接,竖板与导墙槽的侧壁之间设置有插入杆,插入杆的一端与竖板固定连接,另一端与导墙槽的侧壁插接配合,两个竖板之间设置有液压缸,液压缸的两端与两个竖板之间均可拆卸固定连接。本申请具有缩短导墙施工周期的效果。
Steel guide wall for underground continuous wall and construction method of steel guide wall
一种地下连续墙用的钢导墙及其施工方法
YIN CHANGHAI (author) / WANG YANPENG (author) / LI MING (author) / WANG DAYONG (author) / LI ZEJUN (author) / MA YUANYU (author)
2021-01-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel guide wall of underground diaphragm wall and construction method thereof
European Patent Office | 2022
|Underground diaphragm wall guide wall pouring construction system
European Patent Office | 2023
|Guide wall for underground diaphragm wall and construction method
European Patent Office | 2024
|