A platform for research: civil engineering, architecture and urbanism
Prefabricated module and walkway plate connecting structure and construction method thereof
The invention discloses a prefabricated module and walkway plate connecting structure. The structure comprises a first prefabricated module, a second prefabricated module, a prefabricated walkway plate, and a supporting part. The prefabricated walkway plate is located between a second side plate of the first prefabricated module and a first side plate of the second prefabricated module. A pre-buried sleeve with an opening facing the second prefabricated module is arranged on the second side plate of the first prefabricated module, and a pre-buried sleeve with an opening facing the first prefabricated module is arranged on the first side plate of the second prefabricated module. One end of the supporting part is fixedly connected with the pre-buried sleeve of the first prefabricated modulethrough a fastener, and the other end of the supporting part is fixedly connected with the pre-buried sleeve of the second prefabricated module through a fastener. The supporting part abuts against the lower surface of the prefabricated walkway plate. According to the prefabricated module and walkway plate connecting structure and a construction method thereof, the connection problem of the prefabricated modules and the prefabricated walkway plate is solved, and the efficient and reliable connection of the prefabricated modules and the prefabricated walkway plate is achieved, so that a modularbuilding can show more design possibilities.
本发明公开了一种预制模块与走道板连接结构,包括第一预制模块、第二预制模块和预制走道板,预制走道板位于第一预制模块的第二侧板和第二预制模块的第一侧板之间,第一预制模块的第二侧板上设置有开口朝向第二预制模块的预埋套筒,第二预制模块的第一侧板上设置有开口朝向第一预制模块的预埋套筒;连接结构还包括有支撑件,支撑件的一端通过紧固件与第一预制模块的预埋套筒固定连接,支撑件的另一端通过紧固件与第二预制模块的预埋套筒固定连接,支撑件抵接于预制走道板的下表面。本发明解决了预制模块和预制走道板的连接问题,实现了预制模块和预制走道板的高效、可靠连接,从而使得模块化建筑可以呈现出更多设计可能性。
Prefabricated module and walkway plate connecting structure and construction method thereof
The invention discloses a prefabricated module and walkway plate connecting structure. The structure comprises a first prefabricated module, a second prefabricated module, a prefabricated walkway plate, and a supporting part. The prefabricated walkway plate is located between a second side plate of the first prefabricated module and a first side plate of the second prefabricated module. A pre-buried sleeve with an opening facing the second prefabricated module is arranged on the second side plate of the first prefabricated module, and a pre-buried sleeve with an opening facing the first prefabricated module is arranged on the first side plate of the second prefabricated module. One end of the supporting part is fixedly connected with the pre-buried sleeve of the first prefabricated modulethrough a fastener, and the other end of the supporting part is fixedly connected with the pre-buried sleeve of the second prefabricated module through a fastener. The supporting part abuts against the lower surface of the prefabricated walkway plate. According to the prefabricated module and walkway plate connecting structure and a construction method thereof, the connection problem of the prefabricated modules and the prefabricated walkway plate is solved, and the efficient and reliable connection of the prefabricated modules and the prefabricated walkway plate is achieved, so that a modularbuilding can show more design possibilities.
本发明公开了一种预制模块与走道板连接结构,包括第一预制模块、第二预制模块和预制走道板,预制走道板位于第一预制模块的第二侧板和第二预制模块的第一侧板之间,第一预制模块的第二侧板上设置有开口朝向第二预制模块的预埋套筒,第二预制模块的第一侧板上设置有开口朝向第一预制模块的预埋套筒;连接结构还包括有支撑件,支撑件的一端通过紧固件与第一预制模块的预埋套筒固定连接,支撑件的另一端通过紧固件与第二预制模块的预埋套筒固定连接,支撑件抵接于预制走道板的下表面。本发明解决了预制模块和预制走道板的连接问题,实现了预制模块和预制走道板的高效、可靠连接,从而使得模块化建筑可以呈现出更多设计可能性。
Prefabricated module and walkway plate connecting structure and construction method thereof
预制模块与走道板连接结构及其施工方法
ZHANG JIAN (author) / LI JINSHI (author)
2021-01-29
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabricated module, connecting structure of prefabricated module and construction method
European Patent Office | 2022
|European Patent Office | 2024
|Prefabricated plate connecting floor construction method and structure
European Patent Office | 2016
|Prefabricated double-T plate end connecting structure and construction method thereof
European Patent Office | 2021
|