Riverway dredging pipeline for water conservancy project and dredging method
The invention relates to the technical field of water conservancy project equipment, in particular to a riverway dredging pipeline for a water conservancy project and a dredging method. The riverway dredging pipeline comprises a ship body; a protective shell is in bolted connection with the top of the ship body; a first motor is arranged in the protective shell; a sleeve is arranged in the ship boy in a penetrating mode; a threaded rod is arranged in the sleeve; and the threaded rod extends to the top and the bottom of the sleeve, and the top of the sleeve is in bolted connection with a mounting base. According to the riverway dredging pipeline for the water conservancy project and the dredging method, by arranging the first motor, the threaded rod, a dredging pipe, a dredging mechanism, asludge suction pipe, a sludge suction mechanism and a limiting mechanism, the beneficial effects that sludge at the bottom of a riverway can be rapidly removed, the human resource input and the dredging time are greatly reduced, and the dredging work efficiency can be effectively improved are achieved, and the problems that river water generally needs to be pumped completely when sludge at the water bottom is cleaned at present, then excavation equipment is used for removing the sludge at the bottom of a riverway, and a large amount of time is consumed are solved.
本发明涉及水利工程设备技术领域,尤其为一种水利工程用河道清淤管道及清淤方法,包括船体,所述船体的顶部栓接有防护壳,所述防护壳的内部设置有第一电机,所述船体的内部贯穿设置有套管,所述套管的内部设置有螺纹杆,且螺纹杆延伸至套管的顶部和底部,所述套管的顶部栓接有安装座;本发明通过第一电机、螺纹杆、清淤管、清淤机构、吸泥管、吸泥机构和限位机构的设置,具有可以对河道底部的淤泥进行快速清理,大大降低了人力资源投入以及清淤时间,且能够有效增加清淤工作效率的优点,解决了目前在对水底的淤泥进行清理时通常需要将河水抽干,然后使用挖掘设备对河道底部的污泥进行去除,耗费了大量时间的问题。
Riverway dredging pipeline for water conservancy project and dredging method
The invention relates to the technical field of water conservancy project equipment, in particular to a riverway dredging pipeline for a water conservancy project and a dredging method. The riverway dredging pipeline comprises a ship body; a protective shell is in bolted connection with the top of the ship body; a first motor is arranged in the protective shell; a sleeve is arranged in the ship boy in a penetrating mode; a threaded rod is arranged in the sleeve; and the threaded rod extends to the top and the bottom of the sleeve, and the top of the sleeve is in bolted connection with a mounting base. According to the riverway dredging pipeline for the water conservancy project and the dredging method, by arranging the first motor, the threaded rod, a dredging pipe, a dredging mechanism, asludge suction pipe, a sludge suction mechanism and a limiting mechanism, the beneficial effects that sludge at the bottom of a riverway can be rapidly removed, the human resource input and the dredging time are greatly reduced, and the dredging work efficiency can be effectively improved are achieved, and the problems that river water generally needs to be pumped completely when sludge at the water bottom is cleaned at present, then excavation equipment is used for removing the sludge at the bottom of a riverway, and a large amount of time is consumed are solved.
本发明涉及水利工程设备技术领域,尤其为一种水利工程用河道清淤管道及清淤方法,包括船体,所述船体的顶部栓接有防护壳,所述防护壳的内部设置有第一电机,所述船体的内部贯穿设置有套管,所述套管的内部设置有螺纹杆,且螺纹杆延伸至套管的顶部和底部,所述套管的顶部栓接有安装座;本发明通过第一电机、螺纹杆、清淤管、清淤机构、吸泥管、吸泥机构和限位机构的设置,具有可以对河道底部的淤泥进行快速清理,大大降低了人力资源投入以及清淤时间,且能够有效增加清淤工作效率的优点,解决了目前在对水底的淤泥进行清理时通常需要将河水抽干,然后使用挖掘设备对河道底部的污泥进行去除,耗费了大量时间的问题。
Riverway dredging pipeline for water conservancy project and dredging method
一种水利工程用河道清淤管道及清淤方法
PAN XIA (author) / XIONG XINGSONG (author)
2021-02-09
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Environment-friendly dredging equipment for water conservancy project riverway
European Patent Office | 2020
|