Mass concrete articulated chute pouring system and construction method thereof
The invention relates to a mass concrete articulated chute pouring system and a construction method thereof. The mass concrete articulated chute pouring system comprises an articulated chute support structure arranged in a foundation pit and erected on a reinforcement cage in the foundation pit, the articulated chute support structure is connected with the side wall of the foundation pit through an attached wall connecting piece, the articulated chute support structure comprises a main discharging hopper, a material collecting hopper, a material distributing hopper, a stand column jig frame, amaterial distributing hopper supporting frame, a main articulated chute, a branch inclined articulated chute, a vertical articulated chute, a rotary material distributing elbow and an expansion chute. The construction method is suitable for mass concrete pouring construction with a narrow construction site, large site plane arrangement difficulty and high construction organization deployment difficulty, and a turning grading full-coverage articulated chute pouring system under the limited site condition is innovatively designed in combination with existing articulated chute method pouring construction experience.
一种大体积混凝土溜管浇筑体系及其施工方法,包括布置在基坑内、立于基坑内钢筋笼上的溜管支架结构,溜管支架结构通过附着连墙件与基坑侧壁连接,溜管支架结构包括卸料总斗、集料斗、布料斗、立柱胎架、布料斗支撑架、主斜溜管、支斜溜管、竖溜管、旋转布料弯头和扩展溜槽。本发明适用于施工场地狭小、现场平面布置难度大、施工组织部署难度高的大体积混凝土浇筑施工,结合已有的溜管法浇筑施工经验,创新性设计了受限场地条件下转折分级全覆盖溜管浇筑体系。
Mass concrete articulated chute pouring system and construction method thereof
The invention relates to a mass concrete articulated chute pouring system and a construction method thereof. The mass concrete articulated chute pouring system comprises an articulated chute support structure arranged in a foundation pit and erected on a reinforcement cage in the foundation pit, the articulated chute support structure is connected with the side wall of the foundation pit through an attached wall connecting piece, the articulated chute support structure comprises a main discharging hopper, a material collecting hopper, a material distributing hopper, a stand column jig frame, amaterial distributing hopper supporting frame, a main articulated chute, a branch inclined articulated chute, a vertical articulated chute, a rotary material distributing elbow and an expansion chute. The construction method is suitable for mass concrete pouring construction with a narrow construction site, large site plane arrangement difficulty and high construction organization deployment difficulty, and a turning grading full-coverage articulated chute pouring system under the limited site condition is innovatively designed in combination with existing articulated chute method pouring construction experience.
一种大体积混凝土溜管浇筑体系及其施工方法,包括布置在基坑内、立于基坑内钢筋笼上的溜管支架结构,溜管支架结构通过附着连墙件与基坑侧壁连接,溜管支架结构包括卸料总斗、集料斗、布料斗、立柱胎架、布料斗支撑架、主斜溜管、支斜溜管、竖溜管、旋转布料弯头和扩展溜槽。本发明适用于施工场地狭小、现场平面布置难度大、施工组织部署难度高的大体积混凝土浇筑施工,结合已有的溜管法浇筑施工经验,创新性设计了受限场地条件下转折分级全覆盖溜管浇筑体系。
Mass concrete articulated chute pouring system and construction method thereof
一种大体积混凝土溜管浇筑体系及其施工方法