Brick wall masonry process
The invention discloses a brick wall masonry process. The brick wall masonry process comprises the following steps: bottom-layer bricks, middle-layer bricks and top-layer bricks are prepared in advance, the upper surfaces of the top-layer bricks are a plane, glue injection holes vertically formed are formed in the middle-layer bricks in the thickness direction, and the lower surfaces of the bottom-layer bricks are a plane; convex parts or concave parts are arranged below the top-layer bricks and the middle-layer bricks, and concave parts or convex parts are arranged above the middle-layer bricks and the bottom-layer bricks; the convex parts are matched with the concave parts; the bottom-layer bricks are laid on a ground foundation, the middle-layer bricks are placed on the bottom-layer bricks and bonded, the middle-layer bricks and the bottom-layer bricks are positioned through the concave parts and the convex parts, and multiple layers of middle-layer bricks are stacked layer by layerand positioned through the concave parts and the convex parts; after the multiple layers of middle-layer bricks are built, the glue injection holes of all the middle-layer bricks in the same column are located on the same straight line and form a grouting pipeline; reinforcing steel bars can be inserted into the grouting pipeline, and concrete or mortar can be poured; and finally, the top-layer bricks are laid on the middle-layer bricks and bonded.
本发明公开一种砖墙砌筑工艺,预先制备底层砖、中层砖和顶层砖,所述顶层砖的上表面为平面,所述中层砖上设有沿厚度方向竖直设置的注胶孔,底层砖的下表面为平面;顶层砖的下方和中层砖的下方设有凸部件或凹部件,中层砖的上方和底层砖的上方设有凹部件或凸部件;所述凸部件和凹部件相配合;将底层砖铺设在地面基础上,中层砖放置在底层砖之上并粘合,中层砖和底层砖之间通过凹部件和凸部件定位,多层中层砖逐层堆叠并通过凹部件和凸部件定位;多层中层砖砌筑后,同一列的每块中层砖的注胶孔位于同一直线上并形成注浆管道;在注浆管道上可插入钢筋并浇筑混凝土或砂浆;最后将顶层砖铺设在中层砖之上并粘合。
Brick wall masonry process
The invention discloses a brick wall masonry process. The brick wall masonry process comprises the following steps: bottom-layer bricks, middle-layer bricks and top-layer bricks are prepared in advance, the upper surfaces of the top-layer bricks are a plane, glue injection holes vertically formed are formed in the middle-layer bricks in the thickness direction, and the lower surfaces of the bottom-layer bricks are a plane; convex parts or concave parts are arranged below the top-layer bricks and the middle-layer bricks, and concave parts or convex parts are arranged above the middle-layer bricks and the bottom-layer bricks; the convex parts are matched with the concave parts; the bottom-layer bricks are laid on a ground foundation, the middle-layer bricks are placed on the bottom-layer bricks and bonded, the middle-layer bricks and the bottom-layer bricks are positioned through the concave parts and the convex parts, and multiple layers of middle-layer bricks are stacked layer by layerand positioned through the concave parts and the convex parts; after the multiple layers of middle-layer bricks are built, the glue injection holes of all the middle-layer bricks in the same column are located on the same straight line and form a grouting pipeline; reinforcing steel bars can be inserted into the grouting pipeline, and concrete or mortar can be poured; and finally, the top-layer bricks are laid on the middle-layer bricks and bonded.
本发明公开一种砖墙砌筑工艺,预先制备底层砖、中层砖和顶层砖,所述顶层砖的上表面为平面,所述中层砖上设有沿厚度方向竖直设置的注胶孔,底层砖的下表面为平面;顶层砖的下方和中层砖的下方设有凸部件或凹部件,中层砖的上方和底层砖的上方设有凹部件或凸部件;所述凸部件和凹部件相配合;将底层砖铺设在地面基础上,中层砖放置在底层砖之上并粘合,中层砖和底层砖之间通过凹部件和凸部件定位,多层中层砖逐层堆叠并通过凹部件和凸部件定位;多层中层砖砌筑后,同一列的每块中层砖的注胶孔位于同一直线上并形成注浆管道;在注浆管道上可插入钢筋并浇筑混凝土或砂浆;最后将顶层砖铺设在中层砖之上并粘合。
Brick wall masonry process
一种砖墙砌筑工艺
SHI JIANLAN (author) / SU ZHANGBIN (author)
2021-02-19
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|