Pre-burying method of foundation bolts for support beam of unloading station
The invention provides a pre-burying method of foundation bolts for a support beam of an unloading station. The pre-burying method comprises the following steps that S110, fixing holes are drilled ina long-strip-shaped mold according to set intervals, S120, foundation bolts are arranged in the fixing holes in a penetrating mode, and the threaded parts of the foundation bolts extend out of the upper surface of the mold and are fastened through nuts; S130, screw parts of the foundation bolts are welded to a reinforcing mesh of the unloading station, and the lower surface of the mold is locatedon the upper portion of the reinforcing mesh; S140, concrete is adopted for pouring the reinforcing mesh; and S150, after the concrete is solidified, the nuts are unscrewed, and the mold is disassembled. The pre-buried positions of the foundation bolts are limited by the pre-burying, so that the pre-buried position is accurate, and the working efficiency is improved.
本发明提供了一种卸载站支撑梁用地脚螺栓的预埋方法,包括以下步骤:S110:在长条形的模具上按照设定的间距钻设固定孔,S120:在所述固定孔内穿设地脚螺栓,所述地脚螺栓的螺纹部分伸出所述模具的上表面并通过螺母紧固;S130:将所述地脚螺栓的螺杆部分焊接到卸载站的钢筋网上,所述模具的下表面位于所述钢筋网的上部;S140:采用混凝土浇筑所述钢筋网;S150:混凝土凝固后,拧下所述螺母,拆卸所述模具。利用上述方法限定地脚螺栓的预埋位置,使预埋位置准确,提高了工作效率。
Pre-burying method of foundation bolts for support beam of unloading station
The invention provides a pre-burying method of foundation bolts for a support beam of an unloading station. The pre-burying method comprises the following steps that S110, fixing holes are drilled ina long-strip-shaped mold according to set intervals, S120, foundation bolts are arranged in the fixing holes in a penetrating mode, and the threaded parts of the foundation bolts extend out of the upper surface of the mold and are fastened through nuts; S130, screw parts of the foundation bolts are welded to a reinforcing mesh of the unloading station, and the lower surface of the mold is locatedon the upper portion of the reinforcing mesh; S140, concrete is adopted for pouring the reinforcing mesh; and S150, after the concrete is solidified, the nuts are unscrewed, and the mold is disassembled. The pre-buried positions of the foundation bolts are limited by the pre-burying, so that the pre-buried position is accurate, and the working efficiency is improved.
本发明提供了一种卸载站支撑梁用地脚螺栓的预埋方法,包括以下步骤:S110:在长条形的模具上按照设定的间距钻设固定孔,S120:在所述固定孔内穿设地脚螺栓,所述地脚螺栓的螺纹部分伸出所述模具的上表面并通过螺母紧固;S130:将所述地脚螺栓的螺杆部分焊接到卸载站的钢筋网上,所述模具的下表面位于所述钢筋网的上部;S140:采用混凝土浇筑所述钢筋网;S150:混凝土凝固后,拧下所述螺母,拆卸所述模具。利用上述方法限定地脚螺栓的预埋位置,使预埋位置准确,提高了工作效率。
Pre-burying method of foundation bolts for support beam of unloading station
卸载站支撑梁用地脚螺栓的预埋方法
ZHANG GUOYING (author) / LI JIANQI (author) / LI HAILIANG (author) / DU XINGGUANG (author) / LYU BAO (author) / HAO HONGGUO (author) / ZHANG JIAN (author) / QU HAILONG (author) / DU XUEFENG (author) / CHEN KAILANG (author)
2021-02-23
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Method for pre-burying of large group of foundation bolts
European Patent Office | 2015
|Accurate pre-burying structure and method for foundation bolts of street lamp foundation
European Patent Office | 2021
|Steel structure building construction method for one-step pre-burying of foundation bolts
European Patent Office | 2015
|Precise pre-burying method for U-shaped high-strength bolts of steel guardrail
European Patent Office | 2024
|