A platform for research: civil engineering, architecture and urbanism
Asphalt laying process for road construction
The invention discloses an asphalt paving process for road construction, which comprises the following steps: S1, cleaning and leveling a roadbed; S2, laying a cushion layer; S3, laying a woven mesh layer; S4, paving a first asphalt layer; and S5, paving a second asphalt layer. The pavement structure stability can be ensured, and the service life is long.
本发明公开了一种道路施工用沥青铺设工艺,其包括以下步骤,S1清理路基并整平;S2铺设垫层;S3铺设编织网层;S4摊铺第一沥青层;S5摊铺第二沥青层。本发明可以保证路面结构稳定且使用时间长。
Asphalt laying process for road construction
The invention discloses an asphalt paving process for road construction, which comprises the following steps: S1, cleaning and leveling a roadbed; S2, laying a cushion layer; S3, laying a woven mesh layer; S4, paving a first asphalt layer; and S5, paving a second asphalt layer. The pavement structure stability can be ensured, and the service life is long.
本发明公开了一种道路施工用沥青铺设工艺,其包括以下步骤,S1清理路基并整平;S2铺设垫层;S3铺设编织网层;S4摊铺第一沥青层;S5摊铺第二沥青层。本发明可以保证路面结构稳定且使用时间长。
Asphalt laying process for road construction
道路施工用沥青铺设工艺
2021-03-02
Patent
Electronic Resource
Chinese