A platform for research: civil engineering, architecture and urbanism
Large-span steel structure workshop
The invention discloses a large-span steel structure workshop. The large-span steel structure workshop at least comprises a plurality of frame structures arranged in parallel, wingceltis bars, color steel plates and wallboards. The wingceltis bars and the wallboards are all arranged on the frame structures, the color steel plates are arranged on the wingceltis bars, and each frame structure at least comprises a first stand column, a second stand column and a steel beam. Under the condition that the first stand columns and the second stand columns are arranged in a foundation at intervals in the mode of being perpendicular to the ground, the first ends of the steel beams are connected to the first stand columns, the second ends of the steel beams are connected to the second stand columns, and a plurality of containing grooves used for accommodating the wingceltis bars are formed in each steel beam. First tensioning pieces are arranged between the first ends and the second ends of the steel beams, second tensioning pieces are arranged on the first sides of the steel beams, third tensioning pieces are arranged on the second sides of the steel beams, and the two end parts of the secondtensioning pieces and the two end parts of the third tensioning pieces are correspondingly connected to different wingceltis bars. According to the technical scheme of the large-span steel structureworkshop, the wingceltis bars are relatively convenient to assemble and disassemble, and meanwhile, the large-span steel structure workshop has high bearing capacity.
本发明公开了一种大跨度钢结构厂房,至少包括若干个平行排布的框架结构、檀条、彩钢板和墙板,檀条和墙板均设置于框架结构上,彩钢板设置于檀条上,框架结构至少包括第一立柱、第二立柱和钢梁,在第一立柱和第二立柱均按照垂直于地面的方式彼此间隔的设置于地基中的情况下,钢梁的第一端连接至第一立柱,钢梁的第二端连接至第二立柱,钢梁上设置有若干个用于容纳檀条的放置槽,钢梁的第一端和第二端之间置有第一张紧件,钢梁的第一侧设置有第二张紧件,钢梁的第二侧设置有第三张紧件,第二张紧件和第三张紧件各自的两个端部均分别连接至不同的檀条。本申请的技术方案,檀条的安装和拆卸较为方便,同时钢结构厂房具有较高的承载能力。
Large-span steel structure workshop
The invention discloses a large-span steel structure workshop. The large-span steel structure workshop at least comprises a plurality of frame structures arranged in parallel, wingceltis bars, color steel plates and wallboards. The wingceltis bars and the wallboards are all arranged on the frame structures, the color steel plates are arranged on the wingceltis bars, and each frame structure at least comprises a first stand column, a second stand column and a steel beam. Under the condition that the first stand columns and the second stand columns are arranged in a foundation at intervals in the mode of being perpendicular to the ground, the first ends of the steel beams are connected to the first stand columns, the second ends of the steel beams are connected to the second stand columns, and a plurality of containing grooves used for accommodating the wingceltis bars are formed in each steel beam. First tensioning pieces are arranged between the first ends and the second ends of the steel beams, second tensioning pieces are arranged on the first sides of the steel beams, third tensioning pieces are arranged on the second sides of the steel beams, and the two end parts of the secondtensioning pieces and the two end parts of the third tensioning pieces are correspondingly connected to different wingceltis bars. According to the technical scheme of the large-span steel structureworkshop, the wingceltis bars are relatively convenient to assemble and disassemble, and meanwhile, the large-span steel structure workshop has high bearing capacity.
本发明公开了一种大跨度钢结构厂房,至少包括若干个平行排布的框架结构、檀条、彩钢板和墙板,檀条和墙板均设置于框架结构上,彩钢板设置于檀条上,框架结构至少包括第一立柱、第二立柱和钢梁,在第一立柱和第二立柱均按照垂直于地面的方式彼此间隔的设置于地基中的情况下,钢梁的第一端连接至第一立柱,钢梁的第二端连接至第二立柱,钢梁上设置有若干个用于容纳檀条的放置槽,钢梁的第一端和第二端之间置有第一张紧件,钢梁的第一侧设置有第二张紧件,钢梁的第二侧设置有第三张紧件,第二张紧件和第三张紧件各自的两个端部均分别连接至不同的檀条。本申请的技术方案,檀条的安装和拆卸较为方便,同时钢结构厂房具有较高的承载能力。
Large-span steel structure workshop
一种大跨度钢结构厂房
OUYANG QI (author) / YANG CHUNXIANG (author) / LIANG WEISHUN (author)
2021-03-02
Patent
Electronic Resource
Chinese