A platform for research: civil engineering, architecture and urbanism
Building bridge expansion joint construction process
The invention relates to a building bridge expansion joint construction process. A building bridge expansion joint construction device is used, supporting plates of the building bridge expansion jointconstruction device are symmetrically installed front and back, storage tables are installed between the opposite faces of the two supporting plates in a bilateral symmetry mode, and an intermittentconveying mechanism is installed between the two supporting plates. A clamping mechanism is installed on the front end face of the rear side supporting plate, and an intermittent pushing mechanism isinstalled on the upper end face of the front side supporting plate. U-shaped anchor bars can be corrected and clamped through the adopted clamping mechanism, so that the U-shaped anchor bars are aligned with the upper ends of edge beams, and the lower ends of the U-shaped anchor bars are fixed, so the U-shaped anchor bars do not move in the welding process, operators do not need to make direct contact with the U-shaped anchor bars for welding, and the safety of the operators is guaranteed; and meanwhile, an intermittent conveying mechanism is adopted for intermittently conveying the boundary beams at equal intervals, and therefore the intervals between the U-shaped anchor bars are the same.
本发明涉及一种建筑桥梁伸缩缝施工工艺,其使用了一种建筑桥梁伸缩缝施工装置,该建筑桥梁伸缩缝施工装置所述的支撑板前后对称安装,两个支撑板的相对面之间左右对称安装有放置台,两个支撑板之间安装有间歇传送机构,后侧支撑板的前端面安装有卡紧机构,前侧支撑板的上端面安装有间歇推动机构,本发明采用的卡紧机构可对U型锚筋进行矫正与卡紧,使得U型锚筋与边梁的上端对齐,同时又将U型锚筋的下端进行固定,使得U型锚筋在焊接时不发生运动,无需操作人员直接与U型锚筋直接接触焊接,保证了操作人员的安全,同时采用了间歇传送机构对边梁的间歇等距离传送,使得U型锚筋之间的间隔相同。
Building bridge expansion joint construction process
The invention relates to a building bridge expansion joint construction process. A building bridge expansion joint construction device is used, supporting plates of the building bridge expansion jointconstruction device are symmetrically installed front and back, storage tables are installed between the opposite faces of the two supporting plates in a bilateral symmetry mode, and an intermittentconveying mechanism is installed between the two supporting plates. A clamping mechanism is installed on the front end face of the rear side supporting plate, and an intermittent pushing mechanism isinstalled on the upper end face of the front side supporting plate. U-shaped anchor bars can be corrected and clamped through the adopted clamping mechanism, so that the U-shaped anchor bars are aligned with the upper ends of edge beams, and the lower ends of the U-shaped anchor bars are fixed, so the U-shaped anchor bars do not move in the welding process, operators do not need to make direct contact with the U-shaped anchor bars for welding, and the safety of the operators is guaranteed; and meanwhile, an intermittent conveying mechanism is adopted for intermittently conveying the boundary beams at equal intervals, and therefore the intervals between the U-shaped anchor bars are the same.
本发明涉及一种建筑桥梁伸缩缝施工工艺,其使用了一种建筑桥梁伸缩缝施工装置,该建筑桥梁伸缩缝施工装置所述的支撑板前后对称安装,两个支撑板的相对面之间左右对称安装有放置台,两个支撑板之间安装有间歇传送机构,后侧支撑板的前端面安装有卡紧机构,前侧支撑板的上端面安装有间歇推动机构,本发明采用的卡紧机构可对U型锚筋进行矫正与卡紧,使得U型锚筋与边梁的上端对齐,同时又将U型锚筋的下端进行固定,使得U型锚筋在焊接时不发生运动,无需操作人员直接与U型锚筋直接接触焊接,保证了操作人员的安全,同时采用了间歇传送机构对边梁的间歇等距离传送,使得U型锚筋之间的间隔相同。
Building bridge expansion joint construction process
一种建筑桥梁伸缩缝施工工艺
PAN YUEYAN (author) / XIONG FANG (author)
2021-03-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
BRIDGE EXPANSION JOINT AND CONSTRUCTION METHOD OF BRIDGE EXPANSION JOINT
European Patent Office | 2024
|Bridge expansion joint structure and bridge expansion joint structure construction method
European Patent Office | 2024
|Assembly type bridge expansion joint and construction process
European Patent Office | 2021
|