Formwork for building pouring construction
The invention discloses a formwork for building pouring construction, relates to the technical field of building construction, and mainly solves the problems that an existing formwork for building construction is inconvenient to mount and dismount in the using process, and the construction efficiency is affected. The formwork comprises a base, formwork bodies are installed on the base, the formwork bodies are symmetrically arranged on the base, a steel bar frame is arranged between the formwork bodies, width positioning rods are evenly arranged between the positions of the steel bar frame, fixing sleeves are evenly arranged between the formwork bodies, internal threads are arranged at the two ends of each fixing sleeve, the rotating directions of the internal threads are opposite, the twoends of the fixing sleeves are in threaded connection with fixing bolts, the fixing bolts are connected to the formwork bodies in an inserted mode, rubber sleeves are arranged between the fixing boltsand the formwork bodies, the rubber sleeves are installed on the formwork bodies in a limited mode, fixing plates are arranged on the outer side faces of the formwork bodies, clamping jaws are arranged on the fixing plates, and the clamping jaws are connected with a fixing device.
本发明公开了一种建筑浇筑施工用模板,涉及建筑施工技术领域,主要解决现有的建筑施工用模板在使用过程中安装和拆卸不便、影响施工效率的问题;该装置包括基座,所述基座上安装有模板,所述模板对称设置在基座上,所述模板之间设置有钢筋框架,所述钢筋框架之间均匀设置有宽度定位杆,所述模板之间均匀设置有固定套筒,所述固定套筒的两端设置有内螺纹,所述内螺纹的旋向相反,所述固定套筒的两端螺纹连接有固定螺栓,所述固定螺栓插接在模板上,所述固定螺栓与模板之间设置有橡胶套,所述橡胶套限位安装在模板上,所述模板的外侧面设置有固定板,所述固定板上设置有卡爪,所述卡爪与固定装置相连。
Formwork for building pouring construction
The invention discloses a formwork for building pouring construction, relates to the technical field of building construction, and mainly solves the problems that an existing formwork for building construction is inconvenient to mount and dismount in the using process, and the construction efficiency is affected. The formwork comprises a base, formwork bodies are installed on the base, the formwork bodies are symmetrically arranged on the base, a steel bar frame is arranged between the formwork bodies, width positioning rods are evenly arranged between the positions of the steel bar frame, fixing sleeves are evenly arranged between the formwork bodies, internal threads are arranged at the two ends of each fixing sleeve, the rotating directions of the internal threads are opposite, the twoends of the fixing sleeves are in threaded connection with fixing bolts, the fixing bolts are connected to the formwork bodies in an inserted mode, rubber sleeves are arranged between the fixing boltsand the formwork bodies, the rubber sleeves are installed on the formwork bodies in a limited mode, fixing plates are arranged on the outer side faces of the formwork bodies, clamping jaws are arranged on the fixing plates, and the clamping jaws are connected with a fixing device.
本发明公开了一种建筑浇筑施工用模板,涉及建筑施工技术领域,主要解决现有的建筑施工用模板在使用过程中安装和拆卸不便、影响施工效率的问题;该装置包括基座,所述基座上安装有模板,所述模板对称设置在基座上,所述模板之间设置有钢筋框架,所述钢筋框架之间均匀设置有宽度定位杆,所述模板之间均匀设置有固定套筒,所述固定套筒的两端设置有内螺纹,所述内螺纹的旋向相反,所述固定套筒的两端螺纹连接有固定螺栓,所述固定螺栓插接在模板上,所述固定螺栓与模板之间设置有橡胶套,所述橡胶套限位安装在模板上,所述模板的外侧面设置有固定板,所述固定板上设置有卡爪,所述卡爪与固定装置相连。
Formwork for building pouring construction
一种建筑浇筑施工用模板
HUANG YOUBIN (author)
2021-03-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste