A platform for research: civil engineering, architecture and urbanism
Concrete pouring formwork for building construction
The concrete pouring formwork for building construction comprises a base, a pouring table, a fixing structure, an anti-slip strip, a synchronous moving mechanism and a lifting mechanism, first side plates are arranged on the two opposite sides of the top of the pouring table correspondingly, and vertical grooves are formed in the two ends of the opposite sides of the two first side plates correspondingly; the two ends between the two first side plates are both provided with second side plates, the two ends of the two second side plates are both provided with clamping strips in a welded mode, the four clamping strips are matched with the four vertical grooves correspondingly, the fixing structure is used for fixing the two first side plates and the pouring table, a lifting plate is arranged below the base, and the multiple anti-skid strips are evenly bonded to the bottom of the lifting plate. The synchronous moving mechanism is used for driving the fixing structure to move; the lifting mechanism is used for driving the lifting plate to lift. According to the pouring formwork, the assembling steps are simple and convenient, the concrete pouring speed is increased, the disassembling steps are convenient and rapid, and time and labor are saved; and the pouring template can be conveniently fixed at a pouring site, so that the pouring template is difficult to displace, and pouring is facilitated.
本发明公开了一种用于建筑施工的混凝土浇筑模板,包括底座和浇筑台、固定结构、防滑条、同步移动机构和升降机构,浇筑台顶部对立两侧均设有第一侧板,两个第一侧板对立一侧的两端均开设有竖槽,两个第一侧板之间的两端均设置有第二侧板,两个第二侧板的两端均焊接有卡条,四个卡条分别和四个竖槽相适配,固定结构用于固定两个第一侧板和浇筑台,底座下方设有升降板,防滑条设有多个并均匀粘接于升降板底部,同步移动机构用于带动固定结构移动,升降机构用于带动升降板升降。本发明浇筑模板的组装步骤简便、提升混凝土浇筑的速率,且拆卸步骤也方便快捷、省时省力;浇筑模板方便固定在浇筑地点,使其难以发生位移,便于浇筑的进行。
Concrete pouring formwork for building construction
The concrete pouring formwork for building construction comprises a base, a pouring table, a fixing structure, an anti-slip strip, a synchronous moving mechanism and a lifting mechanism, first side plates are arranged on the two opposite sides of the top of the pouring table correspondingly, and vertical grooves are formed in the two ends of the opposite sides of the two first side plates correspondingly; the two ends between the two first side plates are both provided with second side plates, the two ends of the two second side plates are both provided with clamping strips in a welded mode, the four clamping strips are matched with the four vertical grooves correspondingly, the fixing structure is used for fixing the two first side plates and the pouring table, a lifting plate is arranged below the base, and the multiple anti-skid strips are evenly bonded to the bottom of the lifting plate. The synchronous moving mechanism is used for driving the fixing structure to move; the lifting mechanism is used for driving the lifting plate to lift. According to the pouring formwork, the assembling steps are simple and convenient, the concrete pouring speed is increased, the disassembling steps are convenient and rapid, and time and labor are saved; and the pouring template can be conveniently fixed at a pouring site, so that the pouring template is difficult to displace, and pouring is facilitated.
本发明公开了一种用于建筑施工的混凝土浇筑模板,包括底座和浇筑台、固定结构、防滑条、同步移动机构和升降机构,浇筑台顶部对立两侧均设有第一侧板,两个第一侧板对立一侧的两端均开设有竖槽,两个第一侧板之间的两端均设置有第二侧板,两个第二侧板的两端均焊接有卡条,四个卡条分别和四个竖槽相适配,固定结构用于固定两个第一侧板和浇筑台,底座下方设有升降板,防滑条设有多个并均匀粘接于升降板底部,同步移动机构用于带动固定结构移动,升降机构用于带动升降板升降。本发明浇筑模板的组装步骤简便、提升混凝土浇筑的速率,且拆卸步骤也方便快捷、省时省力;浇筑模板方便固定在浇筑地点,使其难以发生位移,便于浇筑的进行。
Concrete pouring formwork for building construction
一种用于建筑施工的混凝土浇筑模板
LU ZHENCUN (author) / SONG HUANGHAI (author) / SONG XIAOHAI (author) / LI YONGFENG (author) / HUANG DI (author)
2024-08-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|