Diaphragm wall construction method for diaphragm wall penetrating through stratum
The invention discloses a diaphragm wall construction method for a diaphragm wall penetrating through a stratum. The diaphragm wall construction method comprises the following steps: S1, surveying andsetting out; S2, constructing a guide wall; S3, preparing slurry, specifically, preparing bentonite, a CMC tackifier, barite and water according to a preset proportion to form the slurry; S4, excavating a groove section; S5, cleaning the bottom and brushing the wall; S6, hoisting and placing a reinforcement cage; and S7, pouring a continuous wall with concrete. According to the diaphragm wall construction method, the slurry in the sediment at the bottom of a tank is recycled, meanwhile, new slurry is supplemented in time according to the machining process, so that the high-performance stability of the slurry in the tank is guaranteed, the tank wall is supported continuously for a long time, the collapse phenomenon of the tank wall is greatly reduced, recycling of the slurry is also realized, and therefore, the construction cost is reduced.
本发明公开了一种连续墙穿透地层的地连墙施工方法,包括步骤:S1,测量放线;S2,导墙施工;S3,泥浆配制:将膨润土、CMC增粘剂、重晶石以及水按预设比例配制以形成泥浆;S4,槽段开挖;S5,清底刷壁;S6,钢筋笼吊放;S7,连续墙砼浇筑。本发明通过对槽底沉渣中的浆液进行回收再利用,同时,根据加工进程及时补入新的泥浆,不仅保证了槽内泥浆的高性能的稳定性,从而使得槽壁得以持续长久的支撑而大大降低其出现坍塌现象,还实现了泥浆的回收再利用,从而降低了施工成本。
Diaphragm wall construction method for diaphragm wall penetrating through stratum
The invention discloses a diaphragm wall construction method for a diaphragm wall penetrating through a stratum. The diaphragm wall construction method comprises the following steps: S1, surveying andsetting out; S2, constructing a guide wall; S3, preparing slurry, specifically, preparing bentonite, a CMC tackifier, barite and water according to a preset proportion to form the slurry; S4, excavating a groove section; S5, cleaning the bottom and brushing the wall; S6, hoisting and placing a reinforcement cage; and S7, pouring a continuous wall with concrete. According to the diaphragm wall construction method, the slurry in the sediment at the bottom of a tank is recycled, meanwhile, new slurry is supplemented in time according to the machining process, so that the high-performance stability of the slurry in the tank is guaranteed, the tank wall is supported continuously for a long time, the collapse phenomenon of the tank wall is greatly reduced, recycling of the slurry is also realized, and therefore, the construction cost is reduced.
本发明公开了一种连续墙穿透地层的地连墙施工方法,包括步骤:S1,测量放线;S2,导墙施工;S3,泥浆配制:将膨润土、CMC增粘剂、重晶石以及水按预设比例配制以形成泥浆;S4,槽段开挖;S5,清底刷壁;S6,钢筋笼吊放;S7,连续墙砼浇筑。本发明通过对槽底沉渣中的浆液进行回收再利用,同时,根据加工进程及时补入新的泥浆,不仅保证了槽内泥浆的高性能的稳定性,从而使得槽壁得以持续长久的支撑而大大降低其出现坍塌现象,还实现了泥浆的回收再利用,从而降低了施工成本。
Diaphragm wall construction method for diaphragm wall penetrating through stratum
一种连续墙穿透地层的地连墙施工方法
XIA MINGTAN (author) / MEI CAN (author) / YANG MEI (author) / ZHENG WENHAO (author) / ZHANG ZIXIN (author)
2021-03-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Diaphragm wall and Construction method for diaphragm wall
European Patent Office | 2020
|Rapid construction method for underground diaphragm wall in complex stratum
European Patent Office | 2021
|