A platform for research: civil engineering, architecture and urbanism
Diaphragm wall and Construction method for diaphragm wall
The present invention provides a construction method of a diaphragm wall which greatly improves the durability of a construction wall. According to an embodiment of the present invention, the construction method of a diaphragm wall comprises: a first step of preparing a first unit reinforcing bar net; a second step of preparing a second unit reinforcing bar net; a third step of forming a first build space; a fourth step of preparing a first mold block; a fifth step of arranging the first mold block in the first build space; a sixth step of arranging the first unit reinforcing bar net in the first build space; a seventh step of acquiring the first unit block; an eighth step of forming a second build space; a ninth step of exposing a first unit protrusion of the first unit block to the outside; a tenth step of preparing a second mold block; an eleventh step of arranging the second mold block in the second build space; a twelfth step of arranging the second unit reinforcing bar net in the second build space; and a thirteenth step of depositing concrete in the second build space to acquire the second unit block. An overlapping area of the first- and second-unit reinforcing nets in the widthwise direction of the construction site can be at least one.
본 발명의 일 실시예에 따른 연속벽 시공방법은, 제1 단위철근망을 준비하는 제1 단계, 제2 단위철근망을 준비하는 제2 단계, 제1 빌드공간을 형성하는 제3 단계, 제1 몰드블록을 준비하는 제4 단계, 상기 제1 몰드블록을 상기 제1 빌드공간에 배치하는 제5 단계, 상기 제1 빌드공간에 상기 제1 단위철근망을 배치하는 제6 단계, 상기 제1 단위블록을 획득하는 제7 단계, 제2 빌드공간을 형성하는 제8 단계, 상기 제1 단위블록의 제1 단위돌출부가 외부로 노출되도록 하는 제9 단계, 제2 몰드블록을 준비하는 제10 단계, 상기 제2 몰드블록을 상기 제2 빌드공간에 배치하는 제11 단계, 제2 빌드공간에 상기 제2 단위철근망을 배치하는 제12 단계 및 상기 제2 빌드공간에 콘크리트를 타설하여, 상기 제2 단위블록을 획득하는 제13 단계를 포함하며, 상기 제1 단위철근망과 상기 제2 단위철근망은, 구축지반의 폭방향으로 중첩되는 영역이 적어도 하나일 수 있다.
Diaphragm wall and Construction method for diaphragm wall
The present invention provides a construction method of a diaphragm wall which greatly improves the durability of a construction wall. According to an embodiment of the present invention, the construction method of a diaphragm wall comprises: a first step of preparing a first unit reinforcing bar net; a second step of preparing a second unit reinforcing bar net; a third step of forming a first build space; a fourth step of preparing a first mold block; a fifth step of arranging the first mold block in the first build space; a sixth step of arranging the first unit reinforcing bar net in the first build space; a seventh step of acquiring the first unit block; an eighth step of forming a second build space; a ninth step of exposing a first unit protrusion of the first unit block to the outside; a tenth step of preparing a second mold block; an eleventh step of arranging the second mold block in the second build space; a twelfth step of arranging the second unit reinforcing bar net in the second build space; and a thirteenth step of depositing concrete in the second build space to acquire the second unit block. An overlapping area of the first- and second-unit reinforcing nets in the widthwise direction of the construction site can be at least one.
본 발명의 일 실시예에 따른 연속벽 시공방법은, 제1 단위철근망을 준비하는 제1 단계, 제2 단위철근망을 준비하는 제2 단계, 제1 빌드공간을 형성하는 제3 단계, 제1 몰드블록을 준비하는 제4 단계, 상기 제1 몰드블록을 상기 제1 빌드공간에 배치하는 제5 단계, 상기 제1 빌드공간에 상기 제1 단위철근망을 배치하는 제6 단계, 상기 제1 단위블록을 획득하는 제7 단계, 제2 빌드공간을 형성하는 제8 단계, 상기 제1 단위블록의 제1 단위돌출부가 외부로 노출되도록 하는 제9 단계, 제2 몰드블록을 준비하는 제10 단계, 상기 제2 몰드블록을 상기 제2 빌드공간에 배치하는 제11 단계, 제2 빌드공간에 상기 제2 단위철근망을 배치하는 제12 단계 및 상기 제2 빌드공간에 콘크리트를 타설하여, 상기 제2 단위블록을 획득하는 제13 단계를 포함하며, 상기 제1 단위철근망과 상기 제2 단위철근망은, 구축지반의 폭방향으로 중첩되는 영역이 적어도 하나일 수 있다.
Diaphragm wall and Construction method for diaphragm wall
연속벽 및 이의 시공방법
KIM PYEONG HWA (author)
2020-08-24
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Diaphragm wall construction method for diaphragm wall penetrating through stratum
European Patent Office | 2021
|Construction method of underground diaphragm wall and underground diaphragm wall
European Patent Office | 2020
|Underground diaphragm wall joint and construction method of underground diaphragm wall
European Patent Office | 2023
|Diaphragm Wall Construction Techniques
ASCE | 2021
|European Patent Office | 2021
|