A platform for research: civil engineering, architecture and urbanism
Beam reinforcing suspended formwork device and construction method thereof
The invention relates to the technical field of building beam reinforcement, in particular to a beam reinforcement suspended formwork device and a construction method thereof. The beam reinforcement suspended formwork device comprises a beam body, a suspender assembly connected with the beam body, and a combined formwork arranged between the beam body and the suspender assembly; the combined formwork abuts against the suspender assembly; a reinforcing space used for containing reinforcing slurry is formed between the beam body and the combined formwork; the suspender assembly comprises a firststeel arm, a bearing part, and a second steel arm; one end of the first steel arm and one end of the second steel arm are connected with the two side faces of the beam body respectively; and the other end of the first steel arm and the other end of the second steel arm are movably connected with the two ends of the bearing part respectively. According to the beam reinforcement suspended formworkdevice, formwork erecting can be conducted without a support formwork erecting system, and a traditional wood support supporting system is replaced, so that the construction operation space is reduced, and the suspender assembly can be repeatedly used.
本发明涉及建筑梁加固补强技术领域,具体涉及一种梁加固吊模装置及其施工方法,该梁加固吊模装置包括梁本体、与所述梁本体连接的吊杆组件、以及设置于所述梁本体与吊杆组件之间的组合模板,所述组合模板抵靠于所述吊杆组件,所述梁本体与组合模板之间构成用于容纳加固浆料的加固空间,所述吊杆组件包括第一钢臂、承托件和第二钢臂,所述第一钢臂的一端和第二钢臂的一端分别连接所述梁本体的两侧面,所述第一钢臂的另一端和第二钢臂的另一端分别与所述承托件的两端活动连接。该梁加固吊模装置无需采用支架支模体系即可进行支模板,替代了传统的木支架支撑体系,且减少了施工作业空间,吊杆组件可重复多次利用。
Beam reinforcing suspended formwork device and construction method thereof
The invention relates to the technical field of building beam reinforcement, in particular to a beam reinforcement suspended formwork device and a construction method thereof. The beam reinforcement suspended formwork device comprises a beam body, a suspender assembly connected with the beam body, and a combined formwork arranged between the beam body and the suspender assembly; the combined formwork abuts against the suspender assembly; a reinforcing space used for containing reinforcing slurry is formed between the beam body and the combined formwork; the suspender assembly comprises a firststeel arm, a bearing part, and a second steel arm; one end of the first steel arm and one end of the second steel arm are connected with the two side faces of the beam body respectively; and the other end of the first steel arm and the other end of the second steel arm are movably connected with the two ends of the bearing part respectively. According to the beam reinforcement suspended formworkdevice, formwork erecting can be conducted without a support formwork erecting system, and a traditional wood support supporting system is replaced, so that the construction operation space is reduced, and the suspender assembly can be repeatedly used.
本发明涉及建筑梁加固补强技术领域,具体涉及一种梁加固吊模装置及其施工方法,该梁加固吊模装置包括梁本体、与所述梁本体连接的吊杆组件、以及设置于所述梁本体与吊杆组件之间的组合模板,所述组合模板抵靠于所述吊杆组件,所述梁本体与组合模板之间构成用于容纳加固浆料的加固空间,所述吊杆组件包括第一钢臂、承托件和第二钢臂,所述第一钢臂的一端和第二钢臂的一端分别连接所述梁本体的两侧面,所述第一钢臂的另一端和第二钢臂的另一端分别与所述承托件的两端活动连接。该梁加固吊模装置无需采用支架支模体系即可进行支模板,替代了传统的木支架支撑体系,且减少了施工作业空间,吊杆组件可重复多次利用。
Beam reinforcing suspended formwork device and construction method thereof
一种梁加固吊模装置及其施工方法
ZHANG YANHONG (author) / WANG CHAO (author) / YANG XIAO (author) / LI QIANG (author)
2021-03-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|Building beam body construction method and formwork reinforcing device thereof
European Patent Office | 2024
|Edge beam and formwork reinforcing device and construction method thereof
European Patent Office | 2022
|Reinforcing method of beam opening formwork and formwork reinforcing device
European Patent Office | 2024
|Detachable beam formwork reinforcing device and construction method
European Patent Office | 2023
|