A platform for research: civil engineering, architecture and urbanism
External scaffold fixing construction method
The invention provides an external scaffold fixing construction method. The method comprises the steps that a mounting hole is formed in a shear wall, wherein a plastic sleeve is arranged at the mounting hole in an aligned mode; a pull-press rod type wall connecting piece is inserted into the mounting hole and the plastic sleeve; and an external scaffold fixed to the pull-press rod type wall connecting piece is arranged beside the shear wall. The external scaffold fixing construction method has the following beneficial effects that (1) the structure is simple, manufacturing is easy and convenient, prefabrication can be achieved, and using is convenient and fast; (2) fixing is firm, and mounting and dismounting are convenient; (3) recycling can be achieved, the economic cost is saved, and labor force is reduced; and (4) subsequent secondary masonry is facilitated, the construction efficiency of the next procedure is improved, the masonry quality is ensured, and the safety risk is reduced.
一种外脚手架固定施工方法,所述方法包括步骤:在剪力墙上设置安装孔;在所述安装孔处对准设置塑料套管;在所述安装孔和所述塑料套管中插入拉压杆式连墙件;在所述剪力墙旁设置与所述拉压杆式连墙件固定的外脚手架。本申请提供的一种外脚手架固定施工方法具有如下有益效果:(1)结构简单、制作简单方便,可以实现预先预制,使用方便便捷;(2)固定牢固、安装拆除方便;(3)可循环重复利用,节约经济成本,减少劳动力;(4)有利于后续二次砌筑,提高下一道工序的施工效率,确保砌筑质量,降低安全风险。
External scaffold fixing construction method
The invention provides an external scaffold fixing construction method. The method comprises the steps that a mounting hole is formed in a shear wall, wherein a plastic sleeve is arranged at the mounting hole in an aligned mode; a pull-press rod type wall connecting piece is inserted into the mounting hole and the plastic sleeve; and an external scaffold fixed to the pull-press rod type wall connecting piece is arranged beside the shear wall. The external scaffold fixing construction method has the following beneficial effects that (1) the structure is simple, manufacturing is easy and convenient, prefabrication can be achieved, and using is convenient and fast; (2) fixing is firm, and mounting and dismounting are convenient; (3) recycling can be achieved, the economic cost is saved, and labor force is reduced; and (4) subsequent secondary masonry is facilitated, the construction efficiency of the next procedure is improved, the masonry quality is ensured, and the safety risk is reduced.
一种外脚手架固定施工方法,所述方法包括步骤:在剪力墙上设置安装孔;在所述安装孔处对准设置塑料套管;在所述安装孔和所述塑料套管中插入拉压杆式连墙件;在所述剪力墙旁设置与所述拉压杆式连墙件固定的外脚手架。本申请提供的一种外脚手架固定施工方法具有如下有益效果:(1)结构简单、制作简单方便,可以实现预先预制,使用方便便捷;(2)固定牢固、安装拆除方便;(3)可循环重复利用,节约经济成本,减少劳动力;(4)有利于后续二次砌筑,提高下一道工序的施工效率,确保砌筑质量,降低安全风险。
External scaffold fixing construction method
一种外脚手架固定施工方法
ZHAO XIANCAI (author) / HAN XUEYING (author) / XU CHAO (author)
2021-03-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Scaffold springboard fixing method for building construction
European Patent Office | 2020
|Auxiliary fixing device for building construction scaffold
European Patent Office | 2021
|Scaffold springboard fixing device for building construction
European Patent Office | 2020
|Scaffold fixing device for special-shaped roof construction
European Patent Office | 2022
|