A platform for research: civil engineering, architecture and urbanism
The invention discloses a fabricated steel structure integrated green building and an installing method thereof, and belongs to the field of fabricated buildings. The fabricated steel structure integrated green building comprises wallboards, water pipes are laid inside the wallboards, a roof is connected to the upper portions of the wallboards, water pipes are laid inside the roof, a floor is connected to the bottoms of the wallboards, and water pipes are laid inside the floor. According to the solution, a steel structure building is divided into three modules, standardized and large-scale production can be achieved, transportation and installation are convenient, heat of sunlight is collected through a heat collecting plate on the roof, water is heated through heat conduction, the hot water flows in the building in a circulating mode, the indoor temperature is increased, and the sunlight is guided through light-guide fibers, so that the light irradiates a photocatalyst air purification net in a room to purify indoor lampblack, air pollution is avoided, and compared with the prior art, the sunlight can be fully utilized, energy is saved, and the environment is protected.
本发明公开了一种装配式钢结构集成绿色建筑及其安装方法,属于装配式建筑领域,一种装配式钢结构集成绿色建筑,包括墙板,墙板的内部铺设有水管,墙板的上方连接有屋顶,且屋顶的内部铺设有水管,墙板底部连接有地板,且地板的内部铺设有水管,本方案将钢结构建筑分成三大模块,可标准化、规模化生产,而且运输、安装方便,它通过屋面上的集热板来收集太阳光的热量,并利用热量传导来加热水,让热水在建筑内循环流动,提高屋内的温度,还通过光导纤维来引导太阳光线,让光线照射屋内的光触媒空气净化网,以对室内的油烟进行净化,避免污染空气,与现有技术相比,它能充分利用太阳光,节能环保。
The invention discloses a fabricated steel structure integrated green building and an installing method thereof, and belongs to the field of fabricated buildings. The fabricated steel structure integrated green building comprises wallboards, water pipes are laid inside the wallboards, a roof is connected to the upper portions of the wallboards, water pipes are laid inside the roof, a floor is connected to the bottoms of the wallboards, and water pipes are laid inside the floor. According to the solution, a steel structure building is divided into three modules, standardized and large-scale production can be achieved, transportation and installation are convenient, heat of sunlight is collected through a heat collecting plate on the roof, water is heated through heat conduction, the hot water flows in the building in a circulating mode, the indoor temperature is increased, and the sunlight is guided through light-guide fibers, so that the light irradiates a photocatalyst air purification net in a room to purify indoor lampblack, air pollution is avoided, and compared with the prior art, the sunlight can be fully utilized, energy is saved, and the environment is protected.
本发明公开了一种装配式钢结构集成绿色建筑及其安装方法,属于装配式建筑领域,一种装配式钢结构集成绿色建筑,包括墙板,墙板的内部铺设有水管,墙板的上方连接有屋顶,且屋顶的内部铺设有水管,墙板底部连接有地板,且地板的内部铺设有水管,本方案将钢结构建筑分成三大模块,可标准化、规模化生产,而且运输、安装方便,它通过屋面上的集热板来收集太阳光的热量,并利用热量传导来加热水,让热水在建筑内循环流动,提高屋内的温度,还通过光导纤维来引导太阳光线,让光线照射屋内的光触媒空气净化网,以对室内的油烟进行净化,避免污染空气,与现有技术相比,它能充分利用太阳光,节能环保。
Fabricated steel structure integrated green building and installing method thereof
一种装配式钢结构集成绿色建筑及其安装方法
GAO YANG (author)
2021-04-02
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
F24C
OTHER DOMESTIC STOVES OR RANGES
,
Andere Hausöfen oder -herde
/
F24D
DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS
,
Haus- oder Raumheizungssysteme, z.B. Zentralheizungssysteme
/
F24F
Klimatisierung
,
AIR-CONDITIONING
/
F24S
Sonnenkollektoren
,
SOLAR HEAT COLLECTORS
Fabricated steel structure integrated green building and mounting process thereof
European Patent Office | 2020
|Fabricated steel structure integrated green building and designing and mounting process thereof
European Patent Office | 2020
|