The invention discloses a construction method for combining a beam-column fabricated frame structure and a laminated cast-in-place slab, and mainly used for fabricated structure construction in the field of constructional engineering. The main construction method comprises the steps that prefabricated columns and prefabricated beams of all floors of a high-rise residence are hoisted and installedthrough a conventional method firstly, then laminated casting slabs of all the floors are prefabricated on site at the corresponding positions of the ground of a bottom layer, finally the laminated casting slabs of all the floors are constructed according to the hoisting and installing sequence from a top layer to the bottom layer, and hoisting work of the laminated casting slabs is completed through a special hoisting machine tool. The construction method has the advantages that the floor slab hoisting work does not occupy a tower crane of the construction site, so that the use efficiency ofthe tower crane is greatly improved; floor slabs are prefabricated on site, and the work that the floor slabs are transported to the construction site from a prefabrication factory and then hoisted, unloaded and stacked is omitted; the special hoisting machine tool for the floor slabs is simple to manufacture and install, the multiple machine tools can hoist all unit floor slabs at the same time,and the construction progress is accelerated; and compared with a traditional mode that floor slabs are hoisted from a storage yard to an installation position and then installed, fixed-point hoistingof each unit floor slab is safer.
本发明公开了一种梁、柱装配式框架结构与叠合现浇板结合的施工方法,主要用于建筑工程领域装配式结构施工;其主要施工方法是:先用常规方法吊装及安装高层住宅的各层预制柱及预制梁,再在底层地面相应位置现场预制各个楼层的叠浇板,最后按顶层至底层的吊装及安装顺序施工各个楼层的叠浇板,叠浇板的吊装工作由专用的吊装机具完成,这样的施工方法的优点是:楼板吊装工作不占用施工场地的塔吊,大大增加了塔吊的使用效率;楼板采用现场预制,省去了楼板从预制厂运送至工地,再吊装卸货及堆放的工作;楼板专用吊装机具制造、安装简单,多台机具可同时起吊各单位楼板,加快了施工进度;各单位楼板定点吊装,较传统的楼板从堆场吊装至安装位置再安装要安全得多。
The invention discloses a construction method for combining a beam-column fabricated frame structure and a laminated cast-in-place slab, and mainly used for fabricated structure construction in the field of constructional engineering. The main construction method comprises the steps that prefabricated columns and prefabricated beams of all floors of a high-rise residence are hoisted and installedthrough a conventional method firstly, then laminated casting slabs of all the floors are prefabricated on site at the corresponding positions of the ground of a bottom layer, finally the laminated casting slabs of all the floors are constructed according to the hoisting and installing sequence from a top layer to the bottom layer, and hoisting work of the laminated casting slabs is completed through a special hoisting machine tool. The construction method has the advantages that the floor slab hoisting work does not occupy a tower crane of the construction site, so that the use efficiency ofthe tower crane is greatly improved; floor slabs are prefabricated on site, and the work that the floor slabs are transported to the construction site from a prefabrication factory and then hoisted, unloaded and stacked is omitted; the special hoisting machine tool for the floor slabs is simple to manufacture and install, the multiple machine tools can hoist all unit floor slabs at the same time,and the construction progress is accelerated; and compared with a traditional mode that floor slabs are hoisted from a storage yard to an installation position and then installed, fixed-point hoistingof each unit floor slab is safer.
本发明公开了一种梁、柱装配式框架结构与叠合现浇板结合的施工方法,主要用于建筑工程领域装配式结构施工;其主要施工方法是:先用常规方法吊装及安装高层住宅的各层预制柱及预制梁,再在底层地面相应位置现场预制各个楼层的叠浇板,最后按顶层至底层的吊装及安装顺序施工各个楼层的叠浇板,叠浇板的吊装工作由专用的吊装机具完成,这样的施工方法的优点是:楼板吊装工作不占用施工场地的塔吊,大大增加了塔吊的使用效率;楼板采用现场预制,省去了楼板从预制厂运送至工地,再吊装卸货及堆放的工作;楼板专用吊装机具制造、安装简单,多台机具可同时起吊各单位楼板,加快了施工进度;各单位楼板定点吊装,较传统的楼板从堆场吊装至安装位置再安装要安全得多。
Construction method for combining beam-column fabricated frame structure and laminated cast-in-place slab
一种梁、柱装配式框架结构与叠合现浇板结合的施工方法
LI NA (author)
2021-04-02
Patent
Electronic Resource
Chinese
Fabricated laminated slab cast-in-place belt hanging formwork construction device
European Patent Office | 2022
|Cast-in-place beam and laminated slab installation construction method
European Patent Office | 2023
|CONSTRUCTION METHOD COMBINING CAST-IN-PLACE CYLINDER STRUCTURE WITH FABRICATED FRAME STRUCTURE
European Patent Office | 2021
|Cast-in-place concrete frame beam and concrete laminated slab connecting structure
European Patent Office | 2022
|Fabricated laminated slab cast-in-place belt hanging formwork construction equipment
European Patent Office | 2023
|