CONSTRUCTION METHOD COMBINING CAST-IN-PLACE CYLINDER STRUCTURE WITH FABRICATED FRAME STRUCTURE
Disclosed in the present invention is a construction method combining a cast-in-place cylinder structure with a fabricated frame structure, mainly applied in the field of construction engineering for high-rise building construction, and high in construction speed, and also ensuring the overall stiffness of a building. The construction method comprises: 1. first constructing a cast-in-place cylinder part to the third-floor topping elevation by utilizing a slip-form construction technology; 2. carrying out hoisting and assembling operation on first-floor and second-floor fabricated frame structures; 3. enabling a vertical reinforcement cage to penetrate through a plurality of U-shaped rebars of first-floor and second-floor frame girders A, and placing the bottom of the vertical reinforcement cage to a foundation top surface of the cylinder; 4. pouring concrete in a cavity of a vertical through hole to enable the cast-in-place concrete to fill the vertical through hole and cavities of a plurality of horizontal holes, and after the concrete reaches certain strength, carrying out slip-form construction on third-floor and fourth-layer cylinders. The construction method for other floors can be carried out in the same manner; the plurality of U-shaped rebars are pre-embedded in joint ends of the frame girders A and the cylinders, and the plurality of U-shaped rebars are in one-to-one correspondence to the plurality of horizontal holes in position.
La présente invention concerne un procédé de construction combinant une structure de cylindre coulée en place avec une structure de bâti préfabriquée, principalement appliqué dans le domaine de l'ingénierie de la construction pour une construction de bâtiment de grande hauteur, et une vitesse de construction rapide, et garantissant également la rigidité globale d'un bâtiment. Le procédé de construction comprend : 1. tout d'abord, la construction d'une partie cylindre coulée en place jusqu'à l'élévation de dalle du troisième étage à l'aide d'une technologie de construction à coffrage glissant ; 2. la réalisation d'une opération de levage et d'assemblage sur des structures de bâti préfabriquées de premier étage et de deuxième étage ; 3. le fait de laisser une cage de renfort verticale pénétrer à travers une pluralité de barres d'armature en forme de U de poutres de bâti de premier étage et de deuxième étage A, et la disposition du fond de la cage de renfort verticale sur une surface supérieure de fondation du cylindre ; 4. le versage de béton dans une cavité d'un trou traversant vertical de façon à permettre au béton coulé en place de remplir le trou traversant vertical et les cavités d'une pluralité de trous horizontaux, et, après que le béton a atteint une certaine résistance, la réalisation d'une construction à coffrage glissant sur des cylindres de troisième étage et de quatrième étage. Le procédé de construction pour d'autres étages peut être réalisé de la même manière ; la pluralité de barres d'armature en forme de U sont pré-incorporées dans des extrémités de liaison des poutres de bâti A et des cylindres, et la pluralité de barres d'armature en forme de U sont en correspondance univoque avec la pluralité de trous horizontaux en position.
本发明公开了现浇筒体结构与装配式结构结合的施工方法,主要用于建筑工程领域中、高层住宅结构施工,它施工速度快,同时保证了建筑物的整体刚度;其施工方法是:1、先用滑模施工工艺施工现浇筒体部分至三层楼面标高处;2、进行一层及二层的装配式框架结构的吊装及拼装工作;3、将竖向钢筋龙穿过一层及二层的框架梁A的多个U形钢筋,其底部放在筒体的基础顶面上;4、向竖向通孔的空腔内注入混凝土,使现浇混凝土充满竖向通孔及多个水平孔的空腔内,待混凝土达到一定强度后,再进行三层及四层的筒体滑模施工;其他楼层的施工方法以此类推;框架梁A与筒体结合的端头预埋有多个U形钢筋,多个U形钢筋的位置与多个水平孔的位置一一对应。
CONSTRUCTION METHOD COMBINING CAST-IN-PLACE CYLINDER STRUCTURE WITH FABRICATED FRAME STRUCTURE
Disclosed in the present invention is a construction method combining a cast-in-place cylinder structure with a fabricated frame structure, mainly applied in the field of construction engineering for high-rise building construction, and high in construction speed, and also ensuring the overall stiffness of a building. The construction method comprises: 1. first constructing a cast-in-place cylinder part to the third-floor topping elevation by utilizing a slip-form construction technology; 2. carrying out hoisting and assembling operation on first-floor and second-floor fabricated frame structures; 3. enabling a vertical reinforcement cage to penetrate through a plurality of U-shaped rebars of first-floor and second-floor frame girders A, and placing the bottom of the vertical reinforcement cage to a foundation top surface of the cylinder; 4. pouring concrete in a cavity of a vertical through hole to enable the cast-in-place concrete to fill the vertical through hole and cavities of a plurality of horizontal holes, and after the concrete reaches certain strength, carrying out slip-form construction on third-floor and fourth-layer cylinders. The construction method for other floors can be carried out in the same manner; the plurality of U-shaped rebars are pre-embedded in joint ends of the frame girders A and the cylinders, and the plurality of U-shaped rebars are in one-to-one correspondence to the plurality of horizontal holes in position.
La présente invention concerne un procédé de construction combinant une structure de cylindre coulée en place avec une structure de bâti préfabriquée, principalement appliqué dans le domaine de l'ingénierie de la construction pour une construction de bâtiment de grande hauteur, et une vitesse de construction rapide, et garantissant également la rigidité globale d'un bâtiment. Le procédé de construction comprend : 1. tout d'abord, la construction d'une partie cylindre coulée en place jusqu'à l'élévation de dalle du troisième étage à l'aide d'une technologie de construction à coffrage glissant ; 2. la réalisation d'une opération de levage et d'assemblage sur des structures de bâti préfabriquées de premier étage et de deuxième étage ; 3. le fait de laisser une cage de renfort verticale pénétrer à travers une pluralité de barres d'armature en forme de U de poutres de bâti de premier étage et de deuxième étage A, et la disposition du fond de la cage de renfort verticale sur une surface supérieure de fondation du cylindre ; 4. le versage de béton dans une cavité d'un trou traversant vertical de façon à permettre au béton coulé en place de remplir le trou traversant vertical et les cavités d'une pluralité de trous horizontaux, et, après que le béton a atteint une certaine résistance, la réalisation d'une construction à coffrage glissant sur des cylindres de troisième étage et de quatrième étage. Le procédé de construction pour d'autres étages peut être réalisé de la même manière ; la pluralité de barres d'armature en forme de U sont pré-incorporées dans des extrémités de liaison des poutres de bâti A et des cylindres, et la pluralité de barres d'armature en forme de U sont en correspondance univoque avec la pluralité de trous horizontaux en position.
本发明公开了现浇筒体结构与装配式结构结合的施工方法,主要用于建筑工程领域中、高层住宅结构施工,它施工速度快,同时保证了建筑物的整体刚度;其施工方法是:1、先用滑模施工工艺施工现浇筒体部分至三层楼面标高处;2、进行一层及二层的装配式框架结构的吊装及拼装工作;3、将竖向钢筋龙穿过一层及二层的框架梁A的多个U形钢筋,其底部放在筒体的基础顶面上;4、向竖向通孔的空腔内注入混凝土,使现浇混凝土充满竖向通孔及多个水平孔的空腔内,待混凝土达到一定强度后,再进行三层及四层的筒体滑模施工;其他楼层的施工方法以此类推;框架梁A与筒体结合的端头预埋有多个U形钢筋,多个U形钢筋的位置与多个水平孔的位置一一对应。
CONSTRUCTION METHOD COMBINING CAST-IN-PLACE CYLINDER STRUCTURE WITH FABRICATED FRAME STRUCTURE
PROCÉDÉ DE CONSTRUCTION COMBINANT UNE STRUCTURE DE CYLINDRE COULÉE EN PLACE AVEC UNE STRUCTURE DE BÂTI PRÉFABRIQUÉE
现浇筒体结构与装配式框架结构结合的施工方法
XIONG JING (author) / PENG BAOAN (author)
2021-04-22
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2021
|Fabricated frame structure and construction method of superimposed cast-in-place slabs
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2021
|