A platform for research: civil engineering, architecture and urbanism
The invention discloses a prefabricated steel structure integrated assembly type green building component, and belongs to the field of assembly type building components. The prefabricated steel structure integrated assembly type green building component is provided. In a scaffold normal working process, when cracks exist in the fixing end, 502 glue in a compressed state and fiber balls forming a fixing fiber cluster filled in the filling cavity can be extruded out, the 502 glue can be rapidly solidified after making contact with a trace amount of water vapor in air to temporarily reinforce thefixing end, and in the subsequent disassembling process, although every two adjacent building component bodies can be violently disassembled, the 502 glue doped with the fixing fiber cluster can be continuously adhered to the surface of the fixing end, and the fixing end is marked as a defective part, so that the cleaning and renovating difficulty of the fixing end is increased, the component isnot easily renovated by bad vendors, the recycled building components can be effectively supervised, and safety accidents and construction accidents easily caused by the fact that the recycled building components do not reach the standard are avoided.
本发明公开了一种预制钢结构一体化装配式绿色建筑构件,属于装配式建筑构件领域,一种预制钢结构一体化装配式绿色建筑构件,在脚手架正常工作过程中,在固定端处出现裂痕时,填充腔内装填的处于压缩状态的502胶和组成固着纤维簇的纤维球会被挤出,在502胶接触到空气中微量的水蒸气后会快速凝固,对固定端进行临时补强,而在后续拆卸过程中,虽然相邻的两个建筑构件主体可以进行暴力拆除,但是掺杂了固着纤维簇的502胶会继续粘附在固定端的表面,将固定端标记为残次件,增加其清理翻新的难度,不易被不良商贩以次充好,可以实现对回收的建筑构件进行有效的监管,不易因回收的建筑构件自身不达标而造成安全事故和施工事故。
The invention discloses a prefabricated steel structure integrated assembly type green building component, and belongs to the field of assembly type building components. The prefabricated steel structure integrated assembly type green building component is provided. In a scaffold normal working process, when cracks exist in the fixing end, 502 glue in a compressed state and fiber balls forming a fixing fiber cluster filled in the filling cavity can be extruded out, the 502 glue can be rapidly solidified after making contact with a trace amount of water vapor in air to temporarily reinforce thefixing end, and in the subsequent disassembling process, although every two adjacent building component bodies can be violently disassembled, the 502 glue doped with the fixing fiber cluster can be continuously adhered to the surface of the fixing end, and the fixing end is marked as a defective part, so that the cleaning and renovating difficulty of the fixing end is increased, the component isnot easily renovated by bad vendors, the recycled building components can be effectively supervised, and safety accidents and construction accidents easily caused by the fact that the recycled building components do not reach the standard are avoided.
本发明公开了一种预制钢结构一体化装配式绿色建筑构件,属于装配式建筑构件领域,一种预制钢结构一体化装配式绿色建筑构件,在脚手架正常工作过程中,在固定端处出现裂痕时,填充腔内装填的处于压缩状态的502胶和组成固着纤维簇的纤维球会被挤出,在502胶接触到空气中微量的水蒸气后会快速凝固,对固定端进行临时补强,而在后续拆卸过程中,虽然相邻的两个建筑构件主体可以进行暴力拆除,但是掺杂了固着纤维簇的502胶会继续粘附在固定端的表面,将固定端标记为残次件,增加其清理翻新的难度,不易被不良商贩以次充好,可以实现对回收的建筑构件进行有效的监管,不易因回收的建筑构件自身不达标而造成安全事故和施工事故。
Prefabricated steel structure integrated assembly type green building component
一种预制钢结构一体化装配式绿色建筑构件
GAO YANG (author)
2021-04-02
Patent
Electronic Resource
Chinese
Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2022
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2023
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2022
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2020
|Assembly type prefabricated building steel structure beam column connecting component
European Patent Office | 2023
|